
Maintenance 25
Lower Seal Band and Bead Disassembly
To remove and replace the lower seal band, Teflon tape, and bead, do the following.
1. Disconnect the VS1620 L-Bar Sealer Tunnel Combo Unit power plug from the
electrical power source.
2. Examine the L-seal area for dirt and debris and for worn parts or torn tape.
3. Temporarily remove the red covers to access the spring compensator assembly
at each end of the seal band.
4. Loosen the spring compensator set screws to unclamp the seal band and free it
at each end.
5. Once the seal band is released, it and the Teflon tape can be removed, and then
the ceramic bead can be pulled out of the channel extrusion. In cross-section, the
arrangement of the seal band, Teflon tape, ceramic bead, and extrusion look
similar to the following illustration and can be disassembled as shown at right.
Temporarily
remove red
cover to
access
spring
compensator
assembly.
Temporarily
remove red
cover to
access
spring
compensator
assembly.
Summary of Contents for Eastey Value Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 29: ...Electrical Schematic 29 Electrical Schematic...
Page 30: ...30 Electrical Schematic Electrical Schematic Continued...
Page 31: ...Illustrated Parts List 31 Illustrated Parts List...
Page 32: ...32 Illustrated Parts List...
Page 33: ...Illustrated Parts List 33...
Page 34: ...34 Illustrated Parts List...
Page 35: ...Illustrated Parts List 35...
Page 36: ...36 Illustrated Parts List...
Page 37: ...Illustrated Parts List 37...
Page 38: ...38 Illustrated Parts List...
Page 39: ...Illustrated Parts List 39...
Page 40: ...40 Illustrated Parts List...
Page 41: ...Illustrated Parts List 41...
Page 42: ...42 Illustrated Parts List...
Page 43: ...Illustrated Parts List 43...
Page 48: ......
Page 49: ......