
16 Installation and Set Up
Aligning the Shrink Tunnel
When the film, product tray and product are correctly aligned, release the red lever
stopper and position the entire sealer and product tray assemblies in line with the shrink
tunnel opening centering the product down the center of the tunnel. Reset the red lever
stopper to lock the sealer assembly in position.
Red Lever
Stopper
Shrink
Tunnel
Opening
Sealer and
Product Tray
Assemblies
Summary of Contents for Eastey Value Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 29: ...Electrical Schematic 29 Electrical Schematic...
Page 30: ...30 Electrical Schematic Electrical Schematic Continued...
Page 31: ...Illustrated Parts List 31 Illustrated Parts List...
Page 32: ...32 Illustrated Parts List...
Page 33: ...Illustrated Parts List 33...
Page 34: ...34 Illustrated Parts List...
Page 35: ...Illustrated Parts List 35...
Page 36: ...36 Illustrated Parts List...
Page 37: ...Illustrated Parts List 37...
Page 38: ...38 Illustrated Parts List...
Page 39: ...Illustrated Parts List 39...
Page 40: ...40 Illustrated Parts List...
Page 41: ...Illustrated Parts List 41...
Page 42: ...42 Illustrated Parts List...
Page 43: ...Illustrated Parts List 43...
Page 48: ......
Page 49: ......