13
7. Insert the man Pivot Pin though the holes in the Tilt
Tower Base and Tilt Tower and secure the Nyloc Nuts.
(See Fig. 8.7)
8. Remove the Tilt Tower Cylinder Pin from the Tilt
Tower Cylinder Shaft. (See Fig. 8.8)
9. Align the Tilt tower and the Safety Hook. Push the Tilt
Tower Safety Pin through the Tilt Tower. (See Fig. 8.9)
10. Be sure the Pin passes through the Safety Hook.
Secure with the Snap Rings. (See Fig. 8.10)
11. Feed The Tilt Tower Air Line through the hole in the
Top of the base Cabinet as shown. (See Fig 8.11)
12. Align the Cylinder Shaft and cylinder pin and hole in
the Tilt Tower and insert the Cylinder Pin. Secure the
Cylinder Pin with the two Cotter Pins and bend Cotter
pins. (See Fig 8.12)
13. Reinstall the Air Oil Regular.
14. Reinstall the Tilt Tower Plastic Cover.
15. Connect the Pressure Gauge Air Line to the Y
Fitting below the Pressure Gauge. (See Fig 8.13)
Fig. 8.9
Fig. 8.10
Fig. 8.11
Fig. 8.13
Fig. 8.12
Fig. 8.8
Fig. 8.7