background image

Page 

10

 of 

12

                                                                                                 

RAD0322PRO

 

 

 

 

 

R&G Racing 

Unit 1, Shelley’s Lane, East Worldham, Alton, Hampshire, GU34 3AQ 

Tel: +44 (0)1420 89007  Fax: +44 (0)1420 87301  

www.rg-racing.com

  Email: 

[email protected]

 

SIE BENÖTIGEN FOLGENDES WERKZEUG:  

 

SATZ STECKSCHLÜSSEL 

 

SATZ INBUSSCHLÜSSEL 

 

SEITENSCHNEIDER  

ALLGEM. ANZUGSDREHMOMENT 

M4 SCHRAUBE = 8Nm

 

M5 SCHRAUBE = 

1

2Nm

 

M6 SCHRAUBE = 

1

5Nm

 

M8 SCHRAUBE = 20Nm

 

M

1

0 SCHRAUBE = 40Nm 

M12 SCHRAUBE = 40Nm

 

 

LIEFERUMFANG 

 

ARTIKEL 

NR.

 

BESCHREIBUNG

 

MENGE

 

ARTIKEL 1 

RAD0322 KÜHLERSCHUTZ 

ARTIKEL 2 

GUMMITSTOPFEN 

ARTIKEL 3 

KABELBINDER  

 

MONTAGE - ZEICHNUNG

  

 

 

 

 

MOTORRAD VORNE 

Summary of Contents for RAD0322PRO

Page 1: ...RUCTIONS ONLY DO NOT PROCEED UNTIL YOU ARE SURE ALL PARTS ARE PRESENT PLEASE READ ALL INSTRUCTIONS BEFORE PROCEEDING IF IN ANY DOUBT WHEN FITTING OUR PRODUCTS CONSULT ONE OF OUR DEALERS OR HAVE FITTED...

Page 2: ...rg racing com Email info rg racing com TOOLS REQUIRED METRIC SOCKET SET SET OF ALLEN KEYS WIRE CUTTERS GENERAL TORQUE SETTINGS M4 BOLT 8Nm M5 BOLT 12Nm M6 BOLT 15Nm M8 BOLT 20Nm M10 BOLT 40Nm M12 BOL...

Page 3: ...R G Racing Unit 1 Shelley s Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com FITTING PICTURES Picture 1 Picture 2 Picture...

Page 4: ...in such state shall conform to the order The Buyer acknowledges no representation or warranty other than as to title has been given or will apply to the Products other than those in R G s order or con...

Page 5: ...PAS PROCEDER AU MONTAGE TANT QUE VOUS N ETES PAS SUR QUE TOUTES LES PIECES SOIENT PRESENTES VEUILLEZ LIRE TOUTES LES INSTRUCTIONS AVANT DE CONTINUER EN CAS DE DOUTE LORS DU MONTAGE DE NOS PRODUITS CON...

Page 6: ...mail info rg racing com OUTILS REQUIS CL M TRIQUE CL S ALLEN PINCE COUPANTE VALEURS DE SERRAGE M4 BOULON 8Nm M5 BOULON 12Nm M6 BOULON 15Nm M8 BOULON 20Nm M10 BOULON 40Nm M12 BOULON 40Nm L GENDE ARTICL...

Page 7: ...22PRO R G Racing Unit 1 Shelley s Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com PHOTOS DE MONTAGE Photo 1 Photo 2 Photo...

Page 8: ...dre comme indiqu sur la photo 3 Pour retirer le radiateur de sa patte de montage sur le c t droit de la moto assurez vous que le support lat ral gauche soit d gag et faites glisser doucement le radiat...

Page 9: ...LE TEILE VORHANDEN SIND LESEN SIE DIE MONTAGEANLEITUNG KOMPLETT DURCH BEVOR SIE ANFANGEN WENN SIE BEI DER MONTAGE DIESES PRODUKTES UNSICHER SIND BITTE EINEN UNSERER H NDLER KONTAKTIEREN ODER DAS KIT V...

Page 10: ...om SIE BEN TIGEN FOLGENDES WERKZEUG SATZ STECKSCHL SSEL SATZ INBUSSCHL SSEL SEITENSCHNEIDER ALLGEM ANZUGSDREHMOMENT M4 SCHRAUBE 8Nm M5 SCHRAUBE 12Nm M6 SCHRAUBE 15Nm M8 SCHRAUBE 20Nm M10 SCHRAUBE 40Nm...

Page 11: ...acing Unit 1 Shelley s Lane East Worldham Alton Hampshire GU34 3AQ Tel 44 0 1420 89007 Fax 44 0 1420 87301 www rg racing com Email info rg racing com MONTAGE ABBILDUNGEN Abbildung 1 Abbildung 2 Abbild...

Page 12: ...uben die den K hler oben am Rahmen befestigen siehe Abbildung 3 Um den K hler an der rechten Seite von seiner Befestigungslasche zu entfernen kontrollieren Sie dass die Halterung f r die linke Seite f...

Reviews: