background image

   Basic Maintenance Checklist

 DAILY 

(after use)

 

  

Clean harness, tees, bottle, and cap.

 

  Clean pressure relief valve.

 

  Clean duckbill valve if used for dosing.

 

  Check tips for clogs.

 

  Ensure harness connector is free from chemical residue and debris.

 WEEKLY

 

  Soak harness connector (in an isopropyl alcohol-based cleaning solution).

•  For best results, soak for 8-48 hours.
•  Allow components to dry completely before reassembly.
•  A low to medium strength thread sealant is recommended when reassembling 

metal to plastic components.

 

  Ensure injection tees are free from obstructions or leaks.

 

  Clean Schrader valve:

•  Remove and lubricate valve core if significant debris is present.

 

  Clean duckbill valve - soak in cleaning solution if significant chemical residue is present.

 

  Thoroughly clean pressure relief valve. 

See Repair Section VII. Cleaning Pressure Relief Valve.

 

AFTER HEAVY USE

 

  

Check tubing ends and cut off deeply scored, kinked, or obstructed tubing with a sharp, 

 

  straight blade (such as box cutter or knife).

 

  Separate and soak injection tees, black push-to-connect tees, tubing segments, and

 

  harness connectors. Allow complete drying before reassembly or storage.

 

  Recommended to lubricate O-rings on pressure relief valve and male barb of harness 

               connector and X-ring on bottle cap as needed and after thorough cleaning.

•  Recommended: Synthetic silicone 

BASIC 

MAINTENANCE

9

INSTRUCTIONS 

FOR USE

III.

INJECTING 

(continued)

5.

6.

Once primed at low pressure, open 
all injection tee valves.

NOTE: 

Inspect the tees and tubing for leaks 

or blockages before continuing.

Pressurize the bottle to 35 psi. If 
more pressure is needed, the bottle 
can be pressurized up to 55 psi.

NOTE: 

The pressure relief valve will release 

pressure at 60 psi. 

7.

open

close

Once the harness and tees are 
empty, close all injection tee 
valves.

NOTE:

 Residual product in the tees 

may need additional time to move into 
the tree once the lines appear empty. 
It is recommended to wait a few 
minutes after the lines appear clear to 
remove the injection tees. 

8.

Slowly and carefully use the pressure relief valve 
on the bottle cap to depressurize the bottle.

Press the quick-disconnect button to release the harness 
connector 

(figure 1)

. Remove each injection tee with another 

slight clockwise turn while pulling it out 

(figure 2)

.

NOTE:

 For easy carrying, remove tees one-by-one around the tree, holding 

every other black push-to-connect tee while coiling the harness 

(figure 3)

.

9.

1.

2.

3.

IV.

CLEANING

1.

Ensure that the 
bottle and harness 
lines are empty.

2.

+

70% isopropyl 

alcohol

Water

=

Cleaning Solution

Fill the bottle 1/3 to 1/2 way with a dilute isopropyl alcohol cleaning solution. To make 
a cleaning solution, mix ONE (1) part 70% isopropyl alcohol to TWO (2) parts water. 

NOTE:

 For 90% isopropyl alcohol, mix 

ONE (1)

 part alcohol to 

THREE (3)

 parts water.

ONE PART

TWO PARTS

For tech support and protocols call

 

877-272-6747

4

Summary of Contents for Q-Connect

Page 1: ...our complete satisfaction Patent Pending The Q connect is designed to allow tree injection treatments to be performed quickly safely and accurately Be certain to read ALL instructions before use Refer...

Page 2: ...TLE CAP MAINTENANCE Add silicone lubricant to the X ring 1 Inspect dip tube for obstructions 2 3 Clean away any residue or debris from components If a component must be removed or replaced it is recom...

Page 3: ...ends are in good condition Switch faulty tee with replacement tee making sure that tubing is inserted fully 2 3 VI REPLACING SCHRADER VALVE CORE 1 Use the core removal tool to unscrew the Schrader va...

Page 4: ...to the product label and measure the required dose NOTE Be sure to wear appropriate personal protective equipment PPE refer to the label for required PPE 2 Insert the bottle stand into the ground to...

Page 5: ...eral pumps to prime the lines 15 25 psi The open tee will help draw product evenly through the harness 3 open tee avoid valleys Drill in healthy tissue REPAIR INSTRUCTIONS I REPLACING SET SCREWS TIGHT...

Page 6: ...silicone BASICMAINTENANCE 9 INSTRUCTIONS FOR USE III INJECTING continued 5 6 Once primed at low pressure open all injection tee valves NOTE Inspect the tees and tubing for leaks or blockages before co...

Page 7: ...pressure resistance in system Raise tubing with pooled product above the level of the surrounding tubing to allow product to be gravity fed into the nearest injection port Close valves on empty injec...

Page 8: ...nting push to connect function Soak push to connect fitting or tee in cleaning solution to loosen residue Harness connector will not snap together Dirt residue build up Thoroughly clean harness connec...

Page 9: ...nting push to connect function Soak push to connect fitting or tee in cleaning solution to loosen residue Harness connector will not snap together Dirt residue build up Thoroughly clean harness connec...

Page 10: ...pressure resistance in system Raise tubing with pooled product above the level of the surrounding tubing to allow product to be gravity fed into the nearest injection port Close valves on empty injec...

Page 11: ...silicone BASICMAINTENANCE 9 INSTRUCTIONS FOR USE III INJECTING continued 5 6 Once primed at low pressure open all injection tee valves NOTE Inspect the tees and tubing for leaks or blockages before co...

Page 12: ...eral pumps to prime the lines 15 25 psi The open tee will help draw product evenly through the harness 3 open tee avoid valleys Drill in healthy tissue REPAIR INSTRUCTIONS I REPLACING SET SCREWS TIGHT...

Page 13: ...to the product label and measure the required dose NOTE Be sure to wear appropriate personal protective equipment PPE refer to the label for required PPE 2 Insert the bottle stand into the ground to...

Page 14: ...ends are in good condition Switch faulty tee with replacement tee making sure that tubing is inserted fully 2 3 VI REPLACING SCHRADER VALVE CORE 1 Use the core removal tool to unscrew the Schrader va...

Page 15: ...TLE CAP MAINTENANCE Add silicone lubricant to the X ring 1 Inspect dip tube for obstructions 2 3 Clean away any residue or debris from components If a component must be removed or replaced it is recom...

Page 16: ...our complete satisfaction Patent Pending The Q connect is designed to allow tree injection treatments to be performed quickly safely and accurately Be certain to read ALL instructions before use Refer...

Reviews: