WS-PRO2 Weather Station Manual
GT
27176
Page 50 of 61
6.2.0 Rain Gauge Installation
Pull the gold funnel up and off of the top of the rain gage. Remove the
rubber band holding the tipping mechanism in place. The rain gage
bubble level mounted on the tipping mechanism is dependant on how
vertical the pole was installed. Adjust the bolts at the bottom of the pole if
necessary. Put the gold funnel back on the top of the rain gage as in
figure 35.
Figure 35
6.3.0 Pyranometer
Level the pyranometer as indicated in Figure 36. Adjust the three leveling
screws until the bubble level indicates plumb.
Remove the red or green
shipping cap from the pyranometer
. See Figure 37.
Summary of Contents for WS-PRO2
Page 22: ...WS PRO2 Weather Station Manual GT 27176 Page 22 of 61 Figure 13...
Page 24: ...WS PRO2 Weather Station Manual GT 27176 Page 24 of 61 Figure 14...
Page 26: ...WS PRO2 Weather Station Manual GT 27176 Page 26 of 61 Figure 15...
Page 28: ...WS PRO2 Weather Station Manual GT 27176 Page 28 of 61 Figure 17...
Page 32: ...WS PRO2 Weather Station Manual GT 27176 Page 32 of 61 Figure 20...
Page 33: ...WS PRO2 Weather Station Manual GT 27176 Page 33 of 61 Figure 21...
Page 46: ...WS PRO2 Weather Station Manual GT 27176 Page 46 of 61 Figure 32...