![Rain Bird WS-PRO2 Installation, Operation, Maintenance And Troubleshooting Download Page 18](http://html1.mh-extra.com/html/rain-bird/ws-pro2/ws-pro2_installation-operation-maintenance-and-troubleshooting_3451667018.webp)
WS-PRO2 Weather Station Manual
GT
27176
Page 18 of 61
4. Cut and save a 9 inch piece of 12 AWG ground wire from the 12
foot length provided. Thread the remaining 11 foot ground wire
through the tower. Secure all wiring so it does not slip back into the
tower or conduit.
5. Place the tower cap over the tower end.
6. Raise the tower on a still day. Place a washer on top of the two
nuts on each foundation bolt. Taking great care not to damage
cables between the tower and conduit, raise the tower and lower it
onto the conduit and mounting bolts. Install a washer and nut on
each bolt and hand tighten. Check plumb of the tower by placing a
level on the north and east sides of the lower tower section. Adjust
the topmost of the two lower nuts (leveling nut) on each bolt as
necessary. When plumb is established, lock the leveling nut in
place by tightening the lowest nut against it. Tighten the three top
nuts with the wrench.
Figure 12
12AWG Wire
4AWG Cable
Ground Lug
Summary of Contents for WS-PRO2
Page 22: ...WS PRO2 Weather Station Manual GT 27176 Page 22 of 61 Figure 13...
Page 24: ...WS PRO2 Weather Station Manual GT 27176 Page 24 of 61 Figure 14...
Page 26: ...WS PRO2 Weather Station Manual GT 27176 Page 26 of 61 Figure 15...
Page 28: ...WS PRO2 Weather Station Manual GT 27176 Page 28 of 61 Figure 17...
Page 32: ...WS PRO2 Weather Station Manual GT 27176 Page 32 of 61 Figure 20...
Page 33: ...WS PRO2 Weather Station Manual GT 27176 Page 33 of 61 Figure 21...
Page 46: ...WS PRO2 Weather Station Manual GT 27176 Page 46 of 61 Figure 32...