Regulation of the supports of the Equipment.

10

6. INSTALLATION INSTRUCTIONS

- Installation should be made by QUALIFIED PERSONNEL.

-

The location for the installation of the equipment should be made on solid ground.

-

You should take into account the weight of the equipment when you choose to use slings.

-

Make sure that the length of the lifting system is correct so that the filtration system is in

a horizontal position when raised.

-

Secure the equipment to the lifting system to avoid accidents.

-

Follow all operation and safety instructions for transporting equipment .

6.1 Installation Steps

The Rain Bird HDF 1X2 Disc Filtration System

equipment is shipped in a box  semi-assembled.

Please follow the steps below for a proper installation.

1. Unpack the equipment carefully and check that there no is no evident damage.

2. Confirm that all installation parameters are met in accordance with those of the equipment.

3. You can modify the height of the equipment with the adjustable supports. Once the supports

are in place adjust their height as required. Due to the equipment dimensions, the shoulders
height should be adjusted  so that,  the upper part of the drainage manifold is placed at a
distance of 33,2" (843 mm) from the ground.  The separation between the shoulders should be
560 mm.

4. Screw the stainless steel bushing to the outlets of the three-way hydraulic valves. It is very

important to use sealer in the threads of both bushings.

5. Assemble the equipment, connecting the inlet, outlet and drainage manifolds using their

connections.

6. Install a glycerin pressure gauge 0-145 psi (0-10) bar to measure the pressure coming into the

valve. It is recommended  you use liquid sealer or LOCTITE 5331, but not in excess.

7. Place the 2” NPT Cap in the open  outlet of the filter base. The cap does not need sealing

because it is provided with an o-ring.

8. Place the cartridge in the filter base. Once this is completed, place the lid on the unit and close

the clamp.

9. Check all connections of the equipment and secure the base to the ground in order to avoid

vibration.

To close the filter check for debris on the 0-ring in the base. Carefully install the lid and close the
filter clamp.  To close the clamp, place the bolt in the grooved seat and adjust the lever then
clamp the anti-opening device and thread the saftey screw without forcing it.

Summary of Contents for HDF 1X2

Page 1: ...1X2...

Page 2: ...g the Height of the Equipment 10 6 3 Securing the Equipment 10 6 4 Connection of the main manifolds inlet outlet and drainage 10 7 Control Unit Connection 10 8 Operation Instructions 10 8 1 Before Sta...

Page 3: ...s only use all necessary security and accident prevention methods to guarantee your security The improper use of the equipment may cause injury to people damage to property or the environment Improper...

Page 4: ...the instructions described in this manual Do not open the filter clamp when the equipment is pressurized it could cause serious injury to people the equipment or to the surrounding area Do use adequa...

Page 5: ...DF Disc Filters systems are subject to strict quality control tests and are manufactured under a production process which complies with the requirements of ISO 9001 2000 Rain Bird is committed to the...

Page 6: ...s responsible for collecting the filtered water and carrying to the exterior Rain Bird HDF 1X2 Disc Filters consists of a filtering element comprised of grooved discs that allows the retention of part...

Page 7: ...exerted by the spring on the discs stack generating a decompression due to the piston displacement raising The release of the discs creates rotation due to the tangential projection of the water comin...

Page 8: ...pment Serial number Max Pressure Year of Manufacturing Manufacturer Model Max Temperature 5 1 Assembly Part Identification COMPONENTS N DESCRIPTION 1 RAIN BIRD HDF DISC FILTER 2 INLET MANIFOLD GROOVED...

Page 9: ...E 14 15 16 13 10 11 12 7 N DESCRIPTION CHECK VALVES WITH ACCESORIES SET OF PISTON GASKETS SPRINGS MAINTENANCE KIT FILTERING ELEMENT O RING FRAME FRAME O RING PISTON GASKET 10 PISTON SPRING 1 1 11 PIST...

Page 10: ...ent dimensions the shoulders height should be adjusted so that the upper part of the drainage manifold is placed at a distance of 33 2 843 mm from the ground The separation between the shoulders shoul...

Page 11: ...inage manifold has a PVC grooved coupling from factory that glues to a 3 PVC pipe Connect the inlet outlet and drainage manifolds with its corresponding connections LEVEL AND SECURE TO THE GROUND TO A...

Page 12: ...P1 High Presure L1 E1 E1 T PRESSURE T PRESSURE The microtubes and unions are labelled according to the following nomenclature 12 7 CONTROL UNIT CONNECTION P1 and P2 are the pressure in the inlet and o...

Page 13: ...cated in the equipment technical data before starting up Do not operate outside of the recommended working conditions Equipment Pressure Make sure that the filter is depressurized before opening it Ma...

Page 14: ...their installation DAILY ACTION 1 Visual inspection of the equipment 2 Check for leakage in the equipment 3 Check the Operation Conditions pressure temperature flow rate PH 4 Evaluation of the equipm...

Page 15: ...lean only the discs in an acid solution If an acid solution is used to clean the discs use the adequate protection clothes glasses gloves face shield Consult the Safety Sheet of the product used Do no...

Page 16: ...ws manually and then use the wrench 5 Lubricate the base of the filter element O ring with a product chemically compatible with the material of the filter Insert the filtering element pushing carefull...

Page 17: ...II Apply grease to the coupling joint III Assemble the coupling 17 B Checking the Intake Filters I Disconnect P1 and P2 micro tubes II Remove the intake filters on the inlet and outlet manifolds with...

Page 18: ...ve any doubt contact your distributor WATER IN THE DRAINAGE MANIFOLD CONTROLLER FILTRATION PROCESS INSPECT EACH OF THE COMMAND MICROTUBES WHICH FEED THE HYDRAULIC VALVES CHAMBERS CHECK THE CORRESPONDI...

Page 19: ...ime of each station from the PROBLEM WITH THE DIFFERENTIAL PRESSURE GAUGE CHECK THE REGULATED VALUE IN THE DIFFERENTIAL PRESSURE GAUGE See section Differential Pressure Gauge Delay from the Control Un...

Page 20: ...ases or chemicals unless these materials and their concentrations are specified in the Rain Bird quotation 6 Electrical supply voltages above or below those specified for correct Filtration Products o...

Page 21: ...oration Tel 520 741 6100 Fax 520 741 6191 E mail Filters Rain Bird com http www RainBird com Request your spares to RAIN BIRD DISC FILTER ASSY DISC Series User s Manual 2013 00 21 4 2 Identification o...

Reviews: