Document ID: RDWR-ALOS-V2815_IG0203
75
Chapter 7 – Hardware-Component Replacement
This chapter contains the following sections:
•
•
Upgrading Memory
Alteon Application Switch platforms with memory configurations other than the default memory
configuration for the product are factory installed. No field memory upgrades are allowed. If you
require a larger memory configuration, make sure to order it with your initial product purchase.
Replacing Components on the Alteon Application Switch
4408, 4416, 5224, 5224 XL, 5412, or 5412 XL
This section contains the following sub-sections:
•
Replacing a Power Supply on Alteon Application Switch 4408, page 75
•
Replacing a Power Supply on Alteon Application Switch 4416, 5224, 5224 XL, 5412, or 5412 XL,
page 76
•
Replacing a Power Supply on Alteon Application Switch 4408
Dual power supplies are hot-swappable.
To replace a power supply on Alteon Application Switch 4408
1. Turn off the device.
Note:
If you are replacing a power supply and the device is operating under power from
the second power supply, there is no need to turn off the device.
2. Disconnect the power cable from the faulty power supply.
3. Remove the faulty power supply from the device.
4. Fully insert the new power supply into the device until the click.
5. Connect the power cable to the new power supply.