- 14 -
Remove the back pane.
Remove side panes.
Side panes shall not be swapped
therefore it is necessary to remember
which one is right, and which one is
left in order to install them back
properly.
CAUTION! Do not remove the front pane!
Remove a weighing pan, a draft
shield, a bottom insert. Clean the
components when detached. With this
your balance mechanism is protected
against accidental damage.
Thus prepared draft shield and panes can be properly cleaned. All the operations should be done
carefully. Pay special CAUTION to the spot where the weighing pan was installed: dirt and other
small elements might enter the balance construction through this opening, which might negatively
influence the balance parameters.
3.6. POWERING THE DEVICE
Balance can be connected to the mains only with a power adapter that comes standard with
the particular model. Nominal power supply of the power adapter (specified on the power
adapter data plate) should be compatible to the power from the mains.
Plug the balance to the mains – connect the power adapter to the socket, next connect its connector
to port located at the back of the balance housing.
Test of the display unit takes place right after connecting the balance to the power, all the elements
and pictograms are backlit for a short time. Next, the name and the program number appears, the
indication gets to ZERO (displayed reading unit depends on the balance). During the balance start,
the test of an internal mass adjustment mechanism occurs (single location and elevation of the
internal mass adjustment).
If the indication is different than zero, please press
button.
CAUTION!If the balance is “verified”, automatic adjustment occurs right after switching the balance on.
Summary of Contents for PS 10100 R2
Page 95: ...95...