background image

8

SCOPIA 

100

 Gateway Quick Start

5.

Insert the SCOPIA

100 

Gateway unit into the 19-

inch rack.

6.

Fasten the brackets to the side rails of the rack.

7.

Make sure that the air vents at the sides of the 
SCOPIA

100 

Gateway unit are not blocked.

A

SSIGN

 

AN

 IP 

A

DDRESS

 

TO

 

THE

 

G

ATEWAY

The first time you install the Gateway, you assign an IP address 
using a terminal cable connection. This allows you to access the 
boot configuration menu of the Gateway. At power-up, the 
Gateway goes through the following boot phases:

Auto-boot—The embedded operating system initializes 
and displays basic information.

Configuration menu—A six-second countdown allows 
you to enter the configuration menu.

Initialization—The Gateway completes its boot 
sequence and is ready for operation.

Note

You can only perform serial port configuration of the 

Gateway at startup, during a short period indicated by a 
six-second countdown. Once the initialization phase is 
complete, the only way you can enter the configuration menu is 
by restarting the Gateway.

Summary of Contents for SCOPIA 100

Page 1: ...SCOPIA100 Gateway Quick Start Version 5 6...

Page 2: ...d reserves the right to revise this publication and make changes without obligation to notify any person of such revisions or changes RADVISION Ltd may make improvements or changes in the product s an...

Page 3: ...y 6 Connect to the IP Network 7 Connect to the ISDN Network PRI and BRI Gateways only 8 Connect to the Serial Interface Serial Gateways only 9 Configure the Gateway 10 Make Trial Calls Note For more d...

Page 4: ...T Before you start configuration fill in the checklist below ISDN NETWORK DIRECTORY NUMBERS PRI AND BRI GATEWAYS ONLY PRI BRI Service Provider Service Provider ______________________ Type of service _...

Page 5: ...Network Access PRI E1 56 Kbps 64 Kbps Port 1 T1 56 Kbps 64 Kbps PRI E1 56 Kbps 64 Kbps Port 2 T1 56 Kbps 64 Kbps PRI E1 Euro ISDN VN6 5ESS Port 1 T1 DMS100 Nat ISDN 5ESS 4ESS NTT Euro ISDN Hong Kong P...

Page 6: ...CMI HDB3 Port 1 NRZ T1 B8ZS AMI B7 NRZ PRI E1 AMI CMI HDB3 Port 2 NRZ T1 B8ZS AMI B7 NRZ PRI E1 CRC4 Double framing Port 1 Extended CRC4 T1 ESF no CRC ESF F4 ESF CRC6 JT F12 F72 PRI E1 CRC4 Double fr...

Page 7: ...5ESS Port 1 5ESS PTP ETSI ETSI PTP VN6 Austel 1 KDD NTT Hong Kong BRI DMS100 Nat ISDN 5ESS Port 2 5ESS PTP ETSI ETSI PTP VN6 Austel 1 KDD NTT Hong Kong BRI DMS100 Nat ISDN 5ESS Port 3 5ESS PTP ETSI E...

Page 8: ..._ _ _ AUDIO PROTOCOLS Preferred Audio Transcoding Priority Disable G 711 ISDN serial G 723 1 IP G 728 ISDN serial G 711 IP G 728 ISDN serial G 711 IP for up to 256 Kbps PREPARE THE SITE When installi...

Page 9: ...nit shipping box Procedure 1 Disconnect all cables including the power cables 2 Place the SCOPIA100 Gateway unit right side up on a hard flat surface with the front panel facing you 3 Position a mount...

Page 10: ...onfiguration menu of the Gateway At power up the Gateway goes through the following boot phases Auto boot The embedded operating system initializes and displays basic information Configuration menu A...

Page 11: ...rTerminal on the PC 2 Configure the communication settings for the PC serial port as follows 9600 Baud rate 8 data bits 1 stop bit No parity No flow control 3 Connect a terminal cable to the PC termin...

Page 12: ...ou can only configure the Gateway by pressing the Reset button on the front panel Figure 2 Network Configuration Main Menu Warning Configuration of any of the parameters other than N should not be per...

Page 13: ...teway returns to the network configuration Main menu displayed at Figure 2 4 At the colon type Q to quit the network configuration Main menu and start the Gateway If you have changed any of the settin...

Page 14: ...r side is an RS 366 connector Gateway terminal adapter cables have either a DTE or a DCE interface The Gateway can identify which type of cable has been connected to its DB 60 serial ports Cable confi...

Page 15: ...iguration tabs 2 Check the settings in the Addressing tab to ensure that the network addressing parameters you entered earlier see Procedure on page 11 were properly recorded in the Gateway SET THE GA...

Page 16: ...to add a new service or select a service and click Edit to modify that service 2 Type in the prefix number for this service select the call type bit rate and ISDN ports for this service Click Upload...

Page 17: ...one BRI port to the other Procedure 1 In the Gateway interface BRI Port tabs Basics section enable the port and define the phone numbers for this port 2 In the Physical Interface Call Policies and Sup...

Page 18: ...the toolbar allows you to save the Gateway configuration parameters as an ini file to your local hard disk or to any network directory that you choose Procedure 1 In the toolbar click Export to displa...

Page 19: ...k terminal to an H 323 endpoint on another IP network or to a terminal on the ISDN network Both B channels have the same number 821816455318 82 is the service prefix for a 2B video call 1816455318 is...

Page 20: ...aling Example 4 384 Kbps bonded call From a videoconferencing endpoint on the IP network dial the Gateway prefix for 384 Kbps bonded calls and the phone number of the destination Gateway or H 320 room...

Reviews: