NOTE: In assembly of boiler heating stove includes pump and ekpansion vessel 10l.
In an assembly the boiler should be properly protected against the
excessive overpressure and overheating.
For the proper installation the plumber/installer is responsible.
The manufacturer (Radijator inzenjering) does not take any responsibility
coming from the incorrect installation of the boiler.
The boiler is adjusted according to the default factory hydro installation as in figure 12.1.
Figure 12.1.
It is obvious that there is only one measuring point S1 and that probe is already positioned. The
second probe that is connected onto the connector on the back of the boiler, in this case, remains
unused.
We need not assemble the pump P2 which serves for the hot water. The parametar which
determines the type of hydro installation inside the automation system is P26 and for this hydro
scheme is P26 set to 0.
If we want to use automation to keep the process and the puffer warming up through the
appropriate pump, then the hydraulic scheme should be as shown in figure 12.2. The point of
probe measuring for water temperature in the puffer is marked with S2.
In order to run operation of automation properly for the hydraulic connection and with the, then
it is necessary to adjust the parameter P26 onto the value 4.