89
Radijator Inženjering d.o.o, 36000 Kraljevo, Živojina Lazića - Solunca br.6, Srbija
tel. +381 36 399 140, fax. +381 36 399 150, http://www.radijator.rs
e-mail: [email protected]
Figure 19. View of display after selection of the option Daily
Figure 20. View of display after selection of the option Weekly
Figure 21. View of display after selection of the option Week-end
8.3 Start of work of
BIO
lux
UNI 20
•
STEP 1:
Boiler
BIO
lux
UNI 20
connected on hydraulic system.
•
STEP 2:
Infuse a small amount of pellets in the silos and close it.
•
STEP 3:
Switch on the boiler.
•
STEP 4:
Initiate feeding system as the first grains of the pellet might fall into the
combustion cup / space.
(This procedure can be applied only when the Automation
system is in OFF mode (Figure 14 : state of regime))
Procedure:
Press the key
P3
, then with keys
P4 or P6
in sub-menu
you
come to the function
LOAD
, confirm with key
P3
, with keys
P4 or P6
you pass from OFF
to
ON
, confirm with key
P3
. By confirming with key
the feeder is started, until the first grains of pellet start falling into combustion cup/space.