Installation Manual 

 

COMBI  -  TA01A011.B1003 

 

 

4

 

GENERAL INSTALLATION REQUIREMENTS 

 

GAS SAFETY 

 
It is the law that all gas appliances are installed by a CORGI registered installer (you can check this by contacting corgi on 01256.372200) in 

accordance with the regulations listed below.  Failure to install appliances correctly could lead to prosecution.  It is in your own interest and 

that of safety to ensure that the law is complied with.  Failure to have your appliance installed to comply with the installation instructions and 

the requirements listed below could invalidate your guarantee. 
 

RELATED DOCUMENTS 

The installation of the boiler must be in accordance with the relevant requirements of the Gas Safety regulations, Building regulations, I.E.E. 

regulations and the bylaws of the local water authority. 
It should be in accordance also with any relevant requirements of the local authority and the relevant recommendations of the following 

British Standard Codes of Practice: 

 

 

B.S 6400: 

1985  & B.S. 6891 : 1988. 

 

BS 5376: 

Selection and Installation of Gas Space Heating ( 1 and 2 family gases) 

 

 

Part 2:  Boilers of rated input not exceeding 60 Kw 

 

BS 5449: 

Central Heating for domestic premises 

 

 

Part 1:  Forced circulation Hot Water System 

 

CP 342: 

Centralised Hot Water Supply BS 6700 : 

1987 

 

 

Part 2:  Buildings other than individual 

 

BS 5440: 

Flues and air supply for Gas Appliances of rated input not exceeding 

 

 

60 Kw (1 and 2 family gases) 

  

Part 

1: 

Flues 

 

 

Part 2:  Air Supply 

 

BS 5446: 

1990:  Installation of Gas Hot Water supplies for domestic purposes 

 

GAS SUPPLY 

Service Pipes:  The local gas region should be consulted at the installation planning stage in order to establish the availability of supply of 

gas.  An existing service pipe must not be used without prior consultation with the local gas region. 

Meters:  A gas meter is connected to the service pipe by the local gas region or local gas region contractor. An existing meter should be 
checked to ensure that it is capable of passing an additional 3.4 m3/hr (125 ft/hr)  before the appliance is installed.  The meter outlet 

governor should ensure a nominal dynamic pressure of 20m Bar, (8 in wg) at the boiler.  Installation pipes should be fitted in accordance 

with BS6891.1988.  

Pipework that supplies the boiler must be a 22 mm. ininterrupted supply from meter to the isolation cock of the 

boiler.

 The complete installation must be tested for soundness as described in the above code, BS 6400: 1985 & BS6891. 

 
IMPORTANT:  BOTH THE USER AND THE MANUFACTURER RELY UPON THE INSTALLER, WHOSE JOB IS TO INSTALL THE BOILER 

AND CONNECT IT TO A CORRECTLY DESIGNED HEATING SYSTEM.  THE INSTALLER SHOULD ACQUAINT HIMSELF WITH THE 

CONTENTS OF THIS PUBLICATION AND THE RELEVANT BRITISH STANDARDS CONCERNING INSTALLATION REQUIREMENTS. 

 

LOCATION OF BOILER 

In siting the combination boiler, the following limitations MUST be observed: 

The position selected for installation should be within the building, and MUST allow  

adequate space for installation, servicing and operation of the combination boiler, and for air circulation around it. The boiler is not suitable 
for external installation. 

This position MUST also allow for a suitable flue termination to be made.  The boiler must be installed on a flat vertical wall which is capable 

of supporting the weight of the combination boiler, and any ancillary equipment. 

If  the boiler is to be fitted in a timber framed building it should be fitted in accordance with the British Gas publication "Guide for Gas 
Installations in Timber Frame Housing, Reference IGE/UP/6. If in doubt, advice must be sought from the local  region of British Gas. 

The boiler may be installed in any room or internal space, although particular attention is drawn to the requirements of the current I.E.E. 

Wiring Regulations, and in Scotland the electrical provisions of the Building Regulations applicable in Scotland, with respect to the 

installation of the boiler in a room or internal space containing a bath or shower. 
Where a room-sealed appliance is installed in a room containing a bath or shower, any electrical switch or appliance control utilising mains 

electricity must be so situated that it cannot be touched by a person using the bath or shower. 

A compartment used to enclose the combination boiler MUST be designed and constructed specifically for this purpose.  An existing 

cupboard, or compartment, may be used provided it is modified accordingly. 
Where installation will be in an unusual location, special procedures may be necessary.  BS 6798 gives detailed guidance on this aspect. 

For clearances to be made available for installation and servicing, see Sections 5.2.2. to 5.2.4. 

 

Summary of Contents for RSF 30

Page 1: ...A01A011 B1003 Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY ENGLISH INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 30 E TYPE C ROOM SEALED SEDBU...

Page 2: ......

Page 3: ...EM page 3 GENERAL INSTALLATION REQUIREMENTS page 4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 13 BOILER CONTROL PANEL page 9 STARTING UP THE BOILER FOR THE FIRST TIME page 9 MULTIGAS OPE...

Page 4: ...ion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be performed by...

Page 5: ...TU h 57774 Heating temperature adjustment C 30 80 Max working pressure heating bar 3 Min working pressure heating bar 0 3 Expansion vessel capacity initial pressure 1 bar Litres 10 Hot water flow rate...

Page 6: ...USE ORIGINAL RADIANT APPROVED FLUE KIT SYSTEMS FLUE ACCESSORIES AND FLUE DIAPHRAGMS ONLY APPROVED RADIANT FLUE DIAPHRAGMS AND ADJUSTMENT TABLES ARE SUPPLIED WITH RADIANT ORIGINAL FLUE KIT SYSTEMS R C...

Page 7: ...ework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above code...

Page 8: ...re the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed guard...

Page 9: ...lation the boiler is equipped with a fittings kit see fig 3 IMPORTANT Before connecting the heating system pipes carefully clean the system to prevent residual dirt from entering into circulation and...

Page 10: ...with an Anti Freeze system which comes into operation when the temperature falls to 5 C Heating sensor and 4 C Hot water sensor and protects the boiler down to 10 C external temperature To protect the...

Page 11: ...strument panel as follows A Turn off the electrical power supply at the mains B Remove the boiler front casing C Undo the two screws on the panel and turn it to the position shown in fig 1 pos 1 D Aft...

Page 12: ...utral and earth connections have been properly connected make sure the type of gas being supplied is the same as the type for which the boiler has been tested and approved see plate data make sure the...

Page 13: ...N position and try the ignition procedure once again If the boiler does not start reset boiler and Set the ON OFF switch 1 to OFF and then ON position IMPORTANT should the boiler fail to ignite wait 3...

Page 14: ...ed d calibrate the new max and min settings for the modulator e replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler When converting the boiler to work with...

Page 15: ...Y THERMOSTAT 9 ELECTRONIC GAS VALVE VK4105 10 ELECTRONIC IGNITION BOARD 11 EXPANSION VESSEL 12 3 SPEED CIRCULATION PUMP WITH AIR VENT 13 AUTOMATIC AIR VENT 14 HEATING CIRCUIT 3 bar PRESSURE RELIEF VAL...

Page 16: ...C M1 1 2 3 4 brown light blue IG black black 17 1 PWM 12 light blue 10 11 grey black RS light blue brown 13 14 16 15 L 12 11 9 10 8 7 6 5 4 3 2 N 56 1bar PAC brown black M3 55 brown brown light blue b...

Page 17: ...tion can be made to either the remote control fig 5 or to the terminal block fig 3 dotted line on the terminals marked SE SE WARNING The remote control connection cable must pass through a channel whi...

Page 18: ...odulation Check that the electrical connection conforms to the description in the instruction manual for the boiler Check the domestic hot water flow rate and temperature When dismantling the boiler c...

Page 19: ...230V ES 30 108 G 00 0416 9 43157LP SEALING CLIPS KIT FOR MULTIPLEX GROUP 9 58009LP MAIN HEAT EXCHANGER mod 30 000 kCal h 9 59012LP AIR PRESSURE SWITCH CE C6065FH1748B 9 59015LA WATER PRESSURE SWITCH...

Page 20: ...LET HAVE BEEN CAREFULLY PREPARED BUT WE RESERVE THE RIGHT TO MAKE CHANGES AND IMPROVEMENTS IN OUR PRODUCTS WHITCH MAY AFFECT THE ACCURANCY OF THE INFORMATION CONTAINED IN THIS LEAFLET E OE ALL RIGHTS...

Reviews: