set  ON/OFF switch in ON position (see fig.1), after a few seconds the pump will come into operation; 

 

once the boiler is working, if any noises are heard in the system, repeat the above air purging procedures until there is no air left in the 
system; 

 

check there are no obstructions in the exhaust duct; 

 

 

check the pressure in the system: if this has gone down, comes on restore pressure

 

close the filling tap R (see fig. 2)  once this operation is completed

 

Filling the system 

After making sure the gas cock is closed, fill the heating system as follows; 

 

fill the system until a pressure of 1.5 bar has been reached (light no. 11 ON; see fig. 1 
pag. 9) and then close the tap on the filling loop; 

 

make sure the cap on the auto air vent valve is slightly loose to allow air to escape from 
the system; 

 

undo the cap on the circulation pump to eliminate any eventual air locks; it is a good 
idea to purge all radiators of air at this point too; 

 

before starting up the boiler the water pressure must be checked again; if this is seen to 
be below 0.5 bar, bring it back up to 1.5 bar (light no. 11 ON; see fig. 1 pag. 9) 

and

 

close the tap on the filling loop

 

 

set  ON/OFF switch in ON position (fig.1 page 9), after a few seconds the pump will 
come into operation; 

 

once the boiler is working, if any noises are heard in the system, repeat the above air 
purging procedures until there is no air left in the system; 

 

check there are no obstructions in the exhaust duct; 

 

 

check the pressure in the system: if this has gone down, comes on restore pressure

 

close the tap on the filling loop once this operation is completed

 

Starting up the boiler 

 

open the gas cock; 

 

turn on the boiler;

 

 

push Pad 5 and select the SUMMER only – WINTER only or SUMMER and WINTER 

mode- Led 8-9 ON confirm the selection; 

the automatic ignition system will turn the burner on

 It may be necessary to repeat the 

procedure a few times to purge air from the pipes. Set the ON/OFF switch 1 (see fig.1) to OFF and then ON position  and try the 
ignition procedure once again. If the boiler does not start, reset boiler and Set the ON/OFF switch 1 to OFF and then ON position. 
 

IMPORTANT 

should the boiler fail to ignite 

wait 3 minutes 

before

 

a new ignition procedure.  

In case of water deficiency the display shows code 04 intermittent and the Led 8 is ON. To restore water pressure open the tap on the filling 

loop and fill the system, when led 10 (1.5 bar pressure) is ON, close the tap. 

 

set ON/OFF switch in OFF position (fig.1 page 9), insert a gauge into the pressure point no.4 (fig.2 page 11). Turn ON the boiler and 
check the minimum and maximum gas pressure setting in accordance with values stated on the gas data plate (to check maximum gas 

pressure value, turn ON a hot water tap and check that the maximum pressure is equal to that stated on the gas data plate; to check the 

minimum gas pressure, close the hot water tap, and select WINTER mode, the pressure gauge will show the minimum gas pressure 
value for 10 seconds. If the pressure values are not the same as those stated on the gas data plate, calibrate pressure again  

 

once the calibration procedure has been completed, unplug the mains lead or turn off the mains switch, close the gas cock and remove 
the gauge from the pressure point; tighten the screw making sure there are no gas leaks; 

 

after carrying out this operation, return the panel to its correct position and put the front casing back. 

CHECK 

the maximum heating power. 

For procedure regarding regulation of the heating system thermal capacity 

see «BOILER ADJUSTMENTS». 

 

EMPTYING THE CENTRAL HEATING SYSTEM 

Whenever it is necessary to empty the system, proceed as follows: 

 

set ON/OFF switch in OFF position (fig.1 page 9); 

 

wait for the boiler to cool down; 

turn the system drain tap 

RS

 (see fig. 3) and use a container to collect the water that runs out; 

 

EMPTYING THE DOMESTIC HOT WATER SYSTEM 

Whenever there is danger of freezing, the hot water system should be emptied in the following way: 

 

shut off the water at the mains; 

 

open all hot and cold water taps; 

 

empty from the lowest point (where possible).

 

 

WARNING 

Please ensure that the boiler in commissioned in line with all BENCHMARK BOOKLET REQUIREMENTS. Failure to do this may in validate 

the guarentee.

Fig. 1

Fig. 3

Fig. 2

Summary of Contents for RSF 30

Page 1: ...A01A011 B1003 Technical Specification RADIANT BRUCIATORI S p A Montelabbate PU ITALY ENGLISH INSTALLATION AND MAINTENANCE MANUAL FOR GAS FIRED WALL HUNG BOILERS Model RSF 30 E TYPE C ROOM SEALED SEDBU...

Page 2: ......

Page 3: ...EM page 3 GENERAL INSTALLATION REQUIREMENTS page 4 BOILER INSTALLATION page 6 ELECTRICAL CONNECTIONS page 8 13 BOILER CONTROL PANEL page 9 STARTING UP THE BOILER FOR THE FIRST TIME page 9 MULTIGAS OPE...

Page 4: ...ion vessel 2 WARNINGS REGARDING INSTALLATION Warranty expires 12 months from date of installation and in all cases no later than 18 months from date of construction First start up must be performed by...

Page 5: ...TU h 57774 Heating temperature adjustment C 30 80 Max working pressure heating bar 3 Min working pressure heating bar 0 3 Expansion vessel capacity initial pressure 1 bar Litres 10 Hot water flow rate...

Page 6: ...USE ORIGINAL RADIANT APPROVED FLUE KIT SYSTEMS FLUE ACCESSORIES AND FLUE DIAPHRAGMS ONLY APPROVED RADIANT FLUE DIAPHRAGMS AND ADJUSTMENT TABLES ARE SUPPLIED WITH RADIANT ORIGINAL FLUE KIT SYSTEMS R C...

Page 7: ...ework that supplies the boiler must be a 22 mm ininterrupted supply from meter to the isolation cock of the boiler The complete installation must be tested for soundness as described in the above code...

Page 8: ...re the lowest part of the terminal is fitted less than 2m 6 6ft above a balcony above ground or above a flat roof to which people have access the terminal MUST be protected by a purpose designed guard...

Page 9: ...lation the boiler is equipped with a fittings kit see fig 3 IMPORTANT Before connecting the heating system pipes carefully clean the system to prevent residual dirt from entering into circulation and...

Page 10: ...with an Anti Freeze system which comes into operation when the temperature falls to 5 C Heating sensor and 4 C Hot water sensor and protects the boiler down to 10 C external temperature To protect the...

Page 11: ...strument panel as follows A Turn off the electrical power supply at the mains B Remove the boiler front casing C Undo the two screws on the panel and turn it to the position shown in fig 1 pos 1 D Aft...

Page 12: ...utral and earth connections have been properly connected make sure the type of gas being supplied is the same as the type for which the boiler has been tested and approved see plate data make sure the...

Page 13: ...N position and try the ignition procedure once again If the boiler does not start reset boiler and Set the ON OFF switch 1 to OFF and then ON position IMPORTANT should the boiler fail to ignite wait 3...

Page 14: ...ed d calibrate the new max and min settings for the modulator e replace the gas setting plate that indicates the type of gas and nominal pressure for the boiler When converting the boiler to work with...

Page 15: ...Y THERMOSTAT 9 ELECTRONIC GAS VALVE VK4105 10 ELECTRONIC IGNITION BOARD 11 EXPANSION VESSEL 12 3 SPEED CIRCULATION PUMP WITH AIR VENT 13 AUTOMATIC AIR VENT 14 HEATING CIRCUIT 3 bar PRESSURE RELIEF VAL...

Page 16: ...C M1 1 2 3 4 brown light blue IG black black 17 1 PWM 12 light blue 10 11 grey black RS light blue brown 13 14 16 15 L 12 11 9 10 8 7 6 5 4 3 2 N 56 1bar PAC brown black M3 55 brown brown light blue b...

Page 17: ...tion can be made to either the remote control fig 5 or to the terminal block fig 3 dotted line on the terminals marked SE SE WARNING The remote control connection cable must pass through a channel whi...

Page 18: ...odulation Check that the electrical connection conforms to the description in the instruction manual for the boiler Check the domestic hot water flow rate and temperature When dismantling the boiler c...

Page 19: ...230V ES 30 108 G 00 0416 9 43157LP SEALING CLIPS KIT FOR MULTIPLEX GROUP 9 58009LP MAIN HEAT EXCHANGER mod 30 000 kCal h 9 59012LP AIR PRESSURE SWITCH CE C6065FH1748B 9 59015LA WATER PRESSURE SWITCH...

Page 20: ...LET HAVE BEEN CAREFULLY PREPARED BUT WE RESERVE THE RIGHT TO MAKE CHANGES AND IMPROVEMENTS IN OUR PRODUCTS WHITCH MAY AFFECT THE ACCURANCY OF THE INFORMATION CONTAINED IN THIS LEAFLET E OE ALL RIGHTS...

Reviews: