17
R1K 75 - RAD - ING - Man.Inst. - 1901.1_
SK.2
_con_PA_AHS
1 Check Lis
t_R1K 75_SK.2_EN
1. INSTALLATION
INST
ALLER
1.1.11. CHECK LIST
+
+
R1K 75 Check List
“Refer more
Gas Valve
Air Vent
Loosen
to Pg 24 for
details”
to increase %
“Refer to Pg 40 for more details”
Use position 1 to adjust maximum Co2 %
Natural Gas 9.3 - 9.1%
LPG 10.3 - 10.1%
Note: Turn screw anti-clock wise to
increase %
“Refer to Pg 40 for more details”
Use position 2 to adjust minimum Co2 %
Natural Gas 9 - 8.8%
LPG 9.9 - 9.7%
Note: Turn screw clock wise
2
1
+
+
Gas Valve
to increase %
“Refer to Pg 40 for more details”
Use position 1 to adjust maximum Co2 %
Natural Gas 9.3 - 9.1%
LPG 10.4 - 10.2%
Note: Turn screw anti-clock wise to
increase %
“Refer to Pg 40 for more details”
Use position 2 to adjust minimum Co2 %
Natural Gas 9 - 8.8%
LPG 9.95 - 9.85%
Note: Turn screw clock wise
L
N
Se
Se
Ta
Ta
1.
2.
Install room
thermostat
Remove
thermostatic
loop after
commissioning
“Refer to Pg 30 for more details”
Control Panel