background image

3

INSTALLATION & OPERATION INSTRUCTION

GENERAL

(1) A manual gas shut-off valve must be installed in the gas supply (service) line ahead of the 
appliance and gas pressure regulator in the gas stream for safety and ease of future service.

(2) The gas pressure regulator supplied must be installed on the appliance prior to connecting the 
equipment to the gas line failure to install a regulator will void the equipment warranty and result in 
a potentially hazardous condition.

(3) The appliance and its individual shut off valve must be disconnected from the gas supply piping 
system during any pressure testing of that system at test pressure in excess of 1/2PSI.

(4) The appliance must be isolated from the gas supply piping system by closing its individual 
manual shut off valve during any pressure testing of the gas supply piping system at test pressure 
equal to or less than 1/2PSI.

(5) Please contact the factory, the factory representative , or a local service company to perform 
maintenance and repairs.

RATING PLATE

The rating plate is located in the right panel of the range. Information on this plate includes the 
model and serial numbers. When communicating with factory about a unit or requesting special 
parts or information, this data is essential for proper identification. Other information on this plate is 
the BTU/hr input of the burners, operating gas pressure in inches WC, and whether the unit is 
orificed for natural or propane gas. Pilot lighting instructions(ovens only) are also located in the 
same area. The Salamander broiler, or Cheesemelter(if provided) is supplied with its own rating 
plate located on the unit.

RADIANCE COOKING APPLIANCES MUST BE CONNECTED

ONLY TO THE TYPE OF GAS IDENTIFIED ON THE RATING PLATE!

Summary of Contents for TARG-6B24RG

Page 1: ...ed shut down units at main shutoff valve and contact the local gas company or gas supplier for service FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors or liquids in the vicinity...

Page 2: ...ore leaving factory The transportation company assumes full responsibility for safe delivery upon acceptance of this equipment if shipment arrives damaged 1 VISIBLE LOSS OR DAMAGE Note on freight bill...

Page 3: ...off valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1 2PSI 5 Please contact the factory the factory representative or a local service company...

Page 4: ...r if the range should move suddenly while being pushed unto position by hand HIGH SHELF ASSEMBLY 1 Mount the high shelf riser to the range with 10 sheet metal screws pointed tips in the back 2 Mount t...

Page 5: ...pt clear to avoid any obstruction of the flow of combustion and ventilation air Adequate clearance must be maintained at all times in front and the sides of the appliances for servicing and proper ope...

Page 6: ...mally supplied by the installer however a pressure regulator is packed inside each Radiance Range The regulators supplied for Radiance Ranges have 3 4 inlet outlet openings and are adjusted at the fac...

Page 7: ...regulator will void the warranty The arrow on the bottom of the regulator should be pointing toward the unit The regulators supplied with ranges have NPT connections Be sure the regulator matches the...

Page 8: ...tors for Movable Gas Appliances ANSI Z21 69 and addendum Z21 69a or latest edition and a quick disconnect device that complies with the standard for quick disconnect devices for use with Gas Fuel shou...

Page 9: ...are equipped with constant burning pilots These are to be manually lighted immediately after the gas is turned on and the system is checked for leaks Burner pilots are provided for each burner and can...

Page 10: ...eck near the floor area for the odor of propane gas before attempting to light any pilot burners 4 Depress the button on the safety valve and hold it in throughout the lighting procedure 5 Light the p...

Page 11: ...dle surface thoroughly with hot soapy water to remove the protective oil coating wiped on at the factory 2 Rinse with a mixture of 1 4 cup vinegar to one quart water 3 Spread unsalted solid shortening...

Page 12: ...e ALL OVENS AND SALAMANDER BROILERS 1 Remove the baking racks Wash in hot soapy water and replace after the rest of the oven is cleaned 2 Remove the oven bottom by lifting it out from the front then s...

Page 13: ...d efficient operation at least yearly by a qualified service company STAINLESS STEEL All stainless steel body parts should wiped regularly with hot soapy water during the day and with a liquid cleaner...

Page 14: ...e for service parts and labor charges performed by non authorized service companies All claims should include the model number serial number proof of purchase date of installation and all pertinent in...

Reviews: