RIGID CONNECTIONS

Double-check any installer-supplied intake pipes visually and/or blow them out with compressed air 
to clear any dirt particles, threading chips , or other foreign matter before installing a service line. 
Those particles will clog orifices when gas pressure is applied.

All connections must be sealed with a joint compound suitable for LP gas, and all connections must 
be tested with a soapy water solution before lighting any pilots!

FLEXIBLE COUPLINGS, CONNECTORS, AND CASTERS

If the unit is to be installed with flexible couplings and/or quick-disconnect fitting, the installer must 
use a heavy-duty, AGA design certified commercial flexible connector of at least 3/4" NPT (with 
suitable strain reliefs). The flexible connector must comply with the standard for Connectors for 
Movable Gas Appliances, ANSI Z21.69 and addendum Z21.69a(or latest edition) and a quick-
disconnect device that complies with the standard for quick-disconnect devices for use with Gas 
Fuel should comply with ANSI Z21.41 and addendum Z21.41a(or latest edition). If disconnection of 
the restraint is necessary , make sure to reconnect restraint after the appliance has been returned 
to its originally installed position. Domestic gas or water connectors are not suitable!

Restraining device may be attached to the back frame/panel of the unit.

If the unit is to be installed with casters, a flexible connector must be used and the same ANSI 
standards apply. Locking front casters are provided to limit the movement of the appliance without 
depending on the connector or associated piping. A suitable strain relief must be installed with the 
flexible connector.

All connections must be sealed with a joint compound suitable for LP gas all connections must be 
tested with a soapy water solution before lighting pilots.

Summary of Contents for TARG-6B24RG

Page 1: ...ed shut down units at main shutoff valve and contact the local gas company or gas supplier for service FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors or liquids in the vicinity...

Page 2: ...ore leaving factory The transportation company assumes full responsibility for safe delivery upon acceptance of this equipment if shipment arrives damaged 1 VISIBLE LOSS OR DAMAGE Note on freight bill...

Page 3: ...off valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1 2PSI 5 Please contact the factory the factory representative or a local service company...

Page 4: ...r if the range should move suddenly while being pushed unto position by hand HIGH SHELF ASSEMBLY 1 Mount the high shelf riser to the range with 10 sheet metal screws pointed tips in the back 2 Mount t...

Page 5: ...pt clear to avoid any obstruction of the flow of combustion and ventilation air Adequate clearance must be maintained at all times in front and the sides of the appliances for servicing and proper ope...

Page 6: ...mally supplied by the installer however a pressure regulator is packed inside each Radiance Range The regulators supplied for Radiance Ranges have 3 4 inlet outlet openings and are adjusted at the fac...

Page 7: ...regulator will void the warranty The arrow on the bottom of the regulator should be pointing toward the unit The regulators supplied with ranges have NPT connections Be sure the regulator matches the...

Page 8: ...tors for Movable Gas Appliances ANSI Z21 69 and addendum Z21 69a or latest edition and a quick disconnect device that complies with the standard for quick disconnect devices for use with Gas Fuel shou...

Page 9: ...are equipped with constant burning pilots These are to be manually lighted immediately after the gas is turned on and the system is checked for leaks Burner pilots are provided for each burner and can...

Page 10: ...eck near the floor area for the odor of propane gas before attempting to light any pilot burners 4 Depress the button on the safety valve and hold it in throughout the lighting procedure 5 Light the p...

Page 11: ...dle surface thoroughly with hot soapy water to remove the protective oil coating wiped on at the factory 2 Rinse with a mixture of 1 4 cup vinegar to one quart water 3 Spread unsalted solid shortening...

Page 12: ...e ALL OVENS AND SALAMANDER BROILERS 1 Remove the baking racks Wash in hot soapy water and replace after the rest of the oven is cleaned 2 Remove the oven bottom by lifting it out from the front then s...

Page 13: ...d efficient operation at least yearly by a qualified service company STAINLESS STEEL All stainless steel body parts should wiped regularly with hot soapy water during the day and with a liquid cleaner...

Page 14: ...e for service parts and labor charges performed by non authorized service companies All claims should include the model number serial number proof of purchase date of installation and all pertinent in...

Reviews: