15
Concealing
Shroud
Heat
Shroud
Elbow
Extension
Deck Mount
Ring
7.
Fit the deck mount rings over the inlet
connectors.
8.
Fit the heat shrouds to the inlet
connectors.
Note!
The access
window of the heat shroud must
align with the isolation valve.
8.
Screw the elbow extensions onto
the inlet connectors and tighten with
a 10 mm hexagonal key. Slide the
concealing shrouds onto the elbow
extensions.
9.
Fit the tap control onto the elbow
extensions pushing down to make
sure it is correctly seated. Use a
2.5 mm hexagonal key to tighten
the grubscrews
and secure the tap
control to the inlet connectors
.
10.
Turn the isolators to the
ON
position
and check for leaks.
11.
Slide the concealing shroud back
to the basin surface to conceal the
grubscrews.
10.
Set the maximum temperature
refer to section: '
Commissioning -
Maximum Temperature Setting'
.
OFF
ON
The access window
of the heat shroud
must
align with the
isolation valve.
Summary of Contents for Safetherm
Page 27: ...27 NOTES...