16
4.
Important:
Flush through the hot and cold supplies thoroughly before
connection to mixing valve.
5.
Connect inlet and outlet pipework, checking that the hot and cold supplies
have been piped to the correct inlets, and check all connections are watertight.
6.
Assemble building-in shroud (407 92) as shown below (
Figure 3
), and fit over
mixing valve in recess. Plaster and tile, or finish as appropriate, up to edge of
shroud. Final wall surface must fall between 2 lines on building-in shroud (see
Figure 3
).
7.
When wall surface is finished, remove the building-in shroud and temperature
knob.
8.
When packed, the concealing plate bracket assembly (408 77) and concealing
plate (408 76) are assembled together. To detach, carefully lever off the
concealing plate by inserting a medium slotted screwdriver blade under each
corner, (see
MAINTENANCE
Figure 1
).
Figure 3 - 215-t3 bc - Wall Recess Finishing
Finished wall surface
Building-in shroud