User Manual 1260-35
Installation Instructions 2-1
Chapter 2
INSTALLATION INSTRUCTIONS
Unpacking and
Inspection
1. Before unpacking the switching module, check the exterior of
the shipping carton for any signs of damage. All irregularities
should be noted on the shipping bill.
2. Remove the instrument from its carton, preserving the factory
packaging as much as possible.
3. Inspect the switching module for any defect or damage.
Immediately notify the carrier if any damage is apparent.
4.
Have a qualified person check the instrument for safety before
use.
CAUTION
Proper ESD handling procedures must always be
used when packing, unpacking or installing any 1260
Series cards. Failure to do so may cause damage to
the unit.
Reshipment
Instructions
1. Use the original packing material when returning the switching
module to Racal Instruments for servicing. The original
shipping carton and the instrument's plastic foam will provide
the necessary support for safe reshipment.
2. If the original packing material is unavailable, wrap the
switching module in plastic sheeting and use plastic spray
foam to surround and protect the instrument.
3. Reship in either the original or a new shipping carton.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com