background image

Maintenance

Before working on the attached implement, switch
off the engine and remove the ignition key.

DO NOT work under a raised implement.

If the implement needs to be raised, take adequate
precautions to prevent the implement from dropping
by accident.

Before working on the hydraulic system, completely
lower the implement in its folded out position and
release any hydraulic pressure.
Dispose of used oil correctly (hydraulic oil is
mineral-based).

After initial use (approx. 8 h), retighten all screws
and bolts and then re-check their tightness at
regular intervals.

Grease the folding frame bearing and crumbling roller
bearing at regular intervals (universal lithium-based
grease).

Daily:

 tow rod guides (

10/1

), spring-mounted track

loosener (

10/2

).

Ensure all linkages are moving freely.

Readjust the stop screws, if required. The side
frame should run parallel to the centre section (

11/1

or 

12/1

) and be folded in (

11/2

 or 

12/2

).

Check the hydraulic hose regularly for signs of
damage or brittleness and replace as required (see
list of spare parts). These hoses are subject to a
natural ageing process and should in any case be
replaced after 5-6 years, regardless of their apparent
condition.

Avoid directing the hose ”at the bearings” for any
length of time when cleaning the implement with
high-pressure water.

With the implement parked, apply a corrosion-
prevention agent to all tools and conserve the piston
rods with acid-free grease.
Touch up any chipped or damaged paintwork.

Replace worn shares immediately, or turn twin-core
shares around. (

Use original spares only

).

10

11

12

1

2

1

2

1

2

6

Summary of Contents for Sturmvogel L Series

Page 1: ...Operating Instructions Seedbed combination Sturmvogel L Order No 9900 00 20GB01...

Page 2: ......

Page 3: ...tled Key to pictograms Loss of warranty This seedbed combination is designed and built exclusively for standard agricultural use Use for any other purpose will be regarded as unauthorized operation an...

Page 4: ...ax KW PS dimensions in mm approx A B C H 4500 L 1706 3 100 135 2950 4500 3168 1698 6000 L 1950 4 133 180 6000 2312 7500 L 2865 5 147 200 7500 3280 9000 L 3385 6 178 240 9000 4312 Attention in the tran...

Page 5: ...order no 1 2 3 Key to illustrations 13 1 refers to Fig 13 item 1 Equipment Three point linkage cat II 4 5 m or cat III 6 9 m hydraulic folding frame twin action spring mounted tined levelling bar roll...

Page 6: ...s check to ensure that no one is standing within its turning circle or operating area Beware of after running roller segments when the implement is lifted at the end of a fast run do not approach unti...

Page 7: ...ment is being used do not fold in when the harrow leafs are set very low unless the two outer sections have already been adjusted to a flatter position connector 4 1 not required for tilth harrows If...

Page 8: ...levelling board levels and breaks up rough clods of earth It is led regardless of the working depth of the harrow make any necessary height adjustments at 7 1 do not allow any walls of earth to be shu...

Page 9: ...w rod guides 10 1 spring mounted track loosener 10 2 Ensure all linkages are moving freely Readjust the stop screws if required The side frame should run parallel to the centre section 11 1 or 12 1 an...

Page 10: ...esult of the mounted implement To ensure safe steering the front axle load of the tractor must not be less than 20 of the empty weight of the vehicle The maximum permitted transportation width is 3 me...

Page 11: ...Sturmvogel 6000 L 1 8...

Page 12: ...Positioning of warning labels on the unit For explanation see subsequent warning symbols 1 2 16 21 19 3 20 4 11 11 6 6 11 4...

Reviews: