background image

Set-up

Check both parts of the coupling for compatibility
(cat.: tractor/ implement).
Set the lower links of the tractor to the same height.
Couple the lower link shaft.
Set the upper control arm to a height that allows it
to reach the implement when in operation.
Correctly secure the coupling assembly (three-point
linkage).
Couple the hydraulic hoses: twin-acting – 2
connections – and ensure they are properly
connected.
Function:

”Lift”

- Fold in

”Depress/Lower - Fold out

Raise the support legs

Check that there is no clashing when the
implement is folded in/folded out, e.g. with a
hinged rear window

Transportation position

To fold in or fold out, lift the implement slightly.

If a 

4.5 m

 long implement is being used, do not fold

in when the harrow leafs are set very low unless the
two outer sections have already been adjusted to a
”flatter” position – connector 

4/1

 (not required for tilth

harrows).

If using a 

9 m

 implement, turn down the locking

hooks (

5/1

) so that they lock automatically before

folding in the implement – ensure they have
engaged correctly.
Insert the track looseners at a low implement width.

Make allowances for the transportation height –
over 4 m.

Mount the lighting gear together with the warning
labels (

3/1

 = Additional Equipment)

Fasten the lower link of the tractor to the side.

Secure the control units in the tractor.

See page 7 for further details of road-transport
procedures.

Converting to operating position

: Fold out the

side sections. On the ”

9 m

 implement”, briefly

activate the pressure transducer to ”fold in” and
disengage the locking device (

5/1

)

3

4

5

1

1

1

1

4

Summary of Contents for Sturmvogel L Series

Page 1: ...Operating Instructions Seedbed combination Sturmvogel L Order No 9900 00 20GB01...

Page 2: ......

Page 3: ...tled Key to pictograms Loss of warranty This seedbed combination is designed and built exclusively for standard agricultural use Use for any other purpose will be regarded as unauthorized operation an...

Page 4: ...ax KW PS dimensions in mm approx A B C H 4500 L 1706 3 100 135 2950 4500 3168 1698 6000 L 1950 4 133 180 6000 2312 7500 L 2865 5 147 200 7500 3280 9000 L 3385 6 178 240 9000 4312 Attention in the tran...

Page 5: ...order no 1 2 3 Key to illustrations 13 1 refers to Fig 13 item 1 Equipment Three point linkage cat II 4 5 m or cat III 6 9 m hydraulic folding frame twin action spring mounted tined levelling bar roll...

Page 6: ...s check to ensure that no one is standing within its turning circle or operating area Beware of after running roller segments when the implement is lifted at the end of a fast run do not approach unti...

Page 7: ...ment is being used do not fold in when the harrow leafs are set very low unless the two outer sections have already been adjusted to a flatter position connector 4 1 not required for tilth harrows If...

Page 8: ...levelling board levels and breaks up rough clods of earth It is led regardless of the working depth of the harrow make any necessary height adjustments at 7 1 do not allow any walls of earth to be shu...

Page 9: ...w rod guides 10 1 spring mounted track loosener 10 2 Ensure all linkages are moving freely Readjust the stop screws if required The side frame should run parallel to the centre section 11 1 or 12 1 an...

Page 10: ...esult of the mounted implement To ensure safe steering the front axle load of the tractor must not be less than 20 of the empty weight of the vehicle The maximum permitted transportation width is 3 me...

Page 11: ...Sturmvogel 6000 L 1 8...

Page 12: ...Positioning of warning labels on the unit For explanation see subsequent warning symbols 1 2 16 21 19 3 20 4 11 11 6 6 11 4...

Reviews:

Related manuals for Sturmvogel L Series