Page
15
of
254
Version 6.3
Rev
r012
Date
05-11-2022
List of Figures
Figure 1: Sonic MBES Block Diagram .................................................................................................... 23
Figure 2: Sonic 2024 Acoustic Centre ................................................................................................... 29
Figure 3: Sonic 2024 Acoustic Centre, as Mounted .............................................................................. 29
Figure 4: Sonic 2022 Acoustic Centre ................................................................................................... 30
Figure 5: Sonic 2022 Acoustic Centre, as Mounted .............................................................................. 30
Figure 6: Sonic 2026 Acoustic Centre ................................................................................................... 31
Figure 7: Sonic 2026 Acoustic Centre, as mounted .............................................................................. 31
Figure 8: Sonic 2024 and Sonic 2022 on the mounting frame ............................................................. 33
Figure 9: Topside of Receive Module ................................................................................................... 34
Figure 10: Receive Module Face ........................................................................................................... 34
Figure 11: Seated connectors (Sonic 2024 on the left and Sonic 2022 on the right) .......................... 34
Figure 12: Connector wiggle - back and forth NOT up and down ........................................................ 34
Figure 13: New cable penetrator with a locking ring ........................................................................... 35
Figure 14: Deck lead to penetrator connection ................................................................................... 35
Figure 15: Lower bracket positioned .................................................................................................... 36
Figure 16: Upper bracket secured ........................................................................................................ 36
Figure 17: Sonic 2020; Standard decklead on top; Penetrator decklead on bottom ........................... 36
Figure 18: Sonic 2024; Standard decklead on top; Penetrator decklead on bottom ........................... 37
Figure 19: Updated Projector housing ................................................................................................. 37
Figure 20: Upper bracket for Projector cable clamp ............................................................................ 38
Figure 21: Projector cable clamp lower bracket .................................................................................. 38
Figure 22: Projector cable clamp upper bracket .................................................................................. 38
Figure 23: Projector cable clamp in place ............................................................................................ 38
Figure 24: Projector cable clamp bolt / mounting arrangement ......................................................... 39
Figure 25: Receive Module with cables connected .............................................................................. 40
Figure 26: Position the insulating bushing ........................................................................................... 40
Figure 27: Sonic 2024 Projector ........................................................................................................... 41
Figure 28: Projector Stand-off .............................................................................................................. 41
Figure 29: Mounting the projector ....................................................................................................... 41
Figure 30: View of the mounted Projector; NB. The connector is facing protective fin ...................... 42
Figure 31: SV Probe mounted in block ................................................................................................. 42
Figure 32: Mounting the Sonic 2026 Projector .................................................................................... 42
Figure 34: Correct Orientation of the Sonic MBES ............................................................................... 44
Figure 35: Sonar Interface Module (SIM) ............................................................................................. 49
Figure 36: Removal of trim to expose securing holes .......................................................................... 50
Figure 37: SIM Interfacing Physical Connections ................................................................................. 51
Figure 38: SIM Interfacing Guide (from the label on top of the SIM) .................................................. 51
Summary of Contents for 2026
Page 2: ...Page 2 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 14: ...Page 14 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 22: ...Page 22 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 28: ...Page 28 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 32: ...Page 32 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 48: ...Page 48 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 56: ...Page 56 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 116: ...Page 116 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 120: ...Page 120 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 122: ...Page 122 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 131: ...Page 131 of 254 Version 6 3 Rev r012 Date 05 11 2022...
Page 138: ...Page 138 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 158: ...Figure 174 Smooth log information copied from a real time survey log...
Page 182: ...Page 182 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 198: ...Page 198 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 210: ...Page 210 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 234: ...Page 234 of 254 Version 6 3 Rev r012 Date 05 11 2022 Part No 96000001...
Page 237: ...Page 237 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 215 Sonic 2026 Projector...
Page 247: ...Page 247 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 225 SIM Stack Outline...
Page 249: ...Page 249 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 227 Locking Ring type Deck Lead...
Page 251: ...Page 251 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 229 I2NS Type 82 IMU offsets...
Page 253: ...Page 253 of 254 Version 6 3 Rev r012 Date 05 11 2022 Figure 231 I2NS SIM Dimensions...