5
Operating instructions
5.1
Warnings
Safety precautions
The operator must apply all relevant safety precautions, including those mentioned in this manual.
Altitude operation
Consult your supplier if operating above 3000 m (9843 ft).
5.2
Initial start
Procedure
Control panel
Step
Action
1
A few minutes before starting, the main supply to the dryer must be switched on to initialize
the Infologic² and the flow switch.
2
Press start button (10).
After a few seconds the dryer is started.
Three-phase units are provided with a phase sequence relay. When the dryer does not
start, switch off the voltage and reverse two incoming electric lines.
Instruction book
2920 7103 90
47