4
Template version: 3
Screen Shelter
side wall full instructions
Erecting the screen shelter
NEVER force the frame and ALWAYS check for tangled storm straps and fabric as this can
happen at anytime, especially when the shelter is put away and folded.
• Take the shelter out of the bag and place on the floor, with the canvas underneath, giving access
to the frame. The legs should be accessible when on the floor. If they are not then you have the
shelter upside down. Unfold each leg, as shown in image 1 below.
• Then lift the centre of the frame until it clicks into place as shown by image 2 below. Please be
careful not to get the storm straps tangled up as they can move about when the shelter is taken
sown and packed away.
• Then extend the roof poles out as shown in image 3 below until they click into place.
• Then repeat the process on the leg poles as shown in image 4 below. Go around putting any clips
that have come off back on, there should be two clips per leg.
• Then zip the front and rear doors together.
• You are now ready to peg. Start in one corner and move around the shelter pegging each corner
and middle of the side panels down first, pulling them right as you go, as shown in image 5.
• Once all the bottom pegging points have been done move onto the storm straps (2 per corner).
1.
3.
4.
2.
image 1
image 2
image 3
image 4
image 5