QS-CH2
6.
If QubicManager has recognized the QS-220-PL correctly, the status of the machine
visible in the lower left corner will change to
Connected
.
7.
Check
Action Center
on the right side panel for a list of actions that requires at-
tention:
It is possible to solve them one by one or by pressing the
Resolve All
button.
Firmware update may require additional confirmation in the dialogue box.
User Manual R1.0
14
Summary of Contents for QS-CH2
Page 1: ......
Page 2: ......
Page 12: ...QS CH2 2 2 PLATFORM LAYOUT AND ACTUATORS MOUNTING POINTS User Manual R1 0 7...
Page 15: ...QS CH2 2 4 EXCURSIONS 2 5 DIMENSIONS User Manual R1 0 10...
Page 25: ...QS CH2 3 3 CONNECTING WITH QS 220 PL EXTENED SET 4 ACTUATORS User Manual R1 0 20...
Page 30: ......
Page 31: ......