8 - DC Power Installation and AC-to-DC Power Supply Conversion Guide
4. Install the tray into the rack. For information about installing the tray, refer to the hardware installation guide.
Turning on the Power to the Trays
1. Turn on the power switch on the rear of each drive tray that is connected to the controller-drive tray.
2. Wait two minutes for the drives to spin up.
3. Turn on the power to both power-fan canisters in the controller-drive tray.
Figure 4. Power Switch on the DC Power-Fan Canister
1. Power Switch for the DC Power-Fan Canister
4. Wait three minutes for the power-up process to complete.
Checking the Hardware Status
The LEDs indicate the status of the tray and its components. A green LED indicates a normal operating status. An
amber LED indicates a fault. Each time you turn on the power, check the status LEDs on the front and rear of the tray.
While the power is being applied, the LEDs blink as the tray and its components complete the power-on process.
For detailed information about the location and status of the LEDs, refer to the installation guide for your particular
tray.
Summary of Contents for StorNext QD7000
Page 7: ...Preface vii DC Power Installation and AC to DC Power Conversion Guide...
Page 11: ......
Page 13: ...ii Table of Contents...
Page 32: ......
Page 33: ......