I
NSTALLING
H
ARDWARE
I
NSTALLING
A
10G/40G SFP+ M
EZZANINE
A
SSEMBLY
2-26
3. Disconnect the linking board from the mainboard connec-
tor.
4. Remove standoff(s) from the mainboard.
5. Remove the mezzanine card.
6. Replace the I/O shield on the rear panel.
Rear Panel I/O Shield (1 of 2)
Rear Panel I/O Shield (2 of 2)
Installing a 10G/40G SFP+ Mez-
zanine Assembly
Prerequisite:
Remove the top cover. See
1. Replace the I/O shield to provide openings for the SFP+
mezzanine card.
Rear Panel I/O Shield (1 of 2)
Rear Panel I/O Shield (2 of 2)
Summary of Contents for STRATOS S400-X44E
Page 24: ...About the Server Chapter 1...
Page 36: ...Installing Hardware Chapter 2...
Page 86: ...BIOS Chapter 3...
Page 155: ...BMC Chapter 4...
Page 217: ...Connectors and Jumpers Chapter 5...
Page 221: ...Rail Kit Assembly Chapter 6...
Page 227: ...Troubleshooting Chapter 7...
Page 232: ...Installation and Assembly Safety Instructions Chapter 8...
Page 237: ...Safety Information Chapter 9...
Page 246: ...Regulatory and Compliance Infor mation Chapter 10...
Page 251: ...REGULATORY AND COMPLIANCE INFORMATION PRODUCT REGULATORY COMPLIANCE MARKINGS 10 5...