12
STEP 3: INSTALLING ROPE PULLEY MOUNTING BOARD/PIGTAIL BOLTS
A. Hold 2”x 4” pulley mounting board up to ends of rafter mounting boards towards front wall. Mark lag bolt location
on each end leaving room for Pigtail lag bolts between rafter mounting board lag bolts and pulley board. Drill 7/32”
hole through pulley board and rafter mounting board. Attach pulley board with 5/16” x 3 ½” lag bolts and washers
(Not Included). Do not over tIghten.
Rope Pulley Mounting Board
Rope Pulley Mounting Board
B. Using distance measurment from pg. (TBD) mark rafter mounting boards. Drill four 7/32” holes and Install Pigtail
Lag bolts into each hole. Threads should disappear into mounting board. Review image for proper depth.
Rope Pulley Mounting Board
Rope Pulley Mounting Board
C. Install Pigtail Lag bolts into each hole. Threads should
disappear into mounting board. Review image for
proper depth.
Summary of Contents for Quadratop 12020-2000
Page 20: ...Instructions Part 12999 3307...