R
January 21, 2013
7019-221D
Page 17
Santa Fe Pellet Insert
7
Appliance Set-Up
A. Leveling System
B. Outside Air Kit Instructions
Parts Included in Kit:
1 piece of 2 inch x 3 ft. flex hose,
2 hose clamps, 1 collar assembly, 1 termination cap
assembly, 1 trim ring, fasteners.
1. Measure distance from floor to air vent opening in appli
-
ance and mark location on wall.
2. Use saw to cut opening in wall. Cut a 2-1/2 to 3 inch
(64-76mm) opening on inside wall and a 3 to 3-1/2 inch
(76-89mm) opening on outside of house.
3. Use hose clamp to secure flex pipe to collar assembly.
4. Slide trim ring over flex pipe and run pipe through wall.
5. Attach hose to outside termination cap with second
hose clamp.
6. Secure termination cap to outside surface.
7. Secure trim ring to interior wall.
Tools Needed:
Phillips head screwdriver; wire cutters;
hole saw or jig saw.
CAUTION
Never draw outside combustion air from:
• Wall, floor or ceiling cavity
• Enclosed space such as an attic or garage
The leveling bolts are located at the rear of the appliance.
To access the bolts, remove the front access panels. Reach
in and turn the bolt to the desired height to level the appli-
ance.
Figure 17.1
Leveling Bolt on Each Side
Flex Hose
Hose Clamp
Collar
Assembly
Hose Clamp
Trim Ring
Termination
Cap Assembly
Air Intake Channel (Discard)
Figure 17.2
Attach Termination
Cap to Exterior Wall
2 inch diameter
Flex Pipe