R
September 1, 2008
7036-135E
Page 3
Mt. Vernon Pellet Insert (AE)
Section 1: Listing and Code Approvals
A. Appliance
Certifications
......................4
B. Mobile Home Approved ......................4
C.
Glass
Specifications
............................4
D.
Electrical
Rating
..................................4
E. BTU & Efficiency Specifications ..........4
Section 2: Getting Started
A. Design, Installation & Location
Considerations
....................................5
B. Locating Your Appliance & Chimney ..6
C. Wall Control Thermostat .....................6
D.
Draft
....................................................6
F.
Negative
Pressure
..............................6
F.
Fire
Safety
..........................................7
G. Tools & Supplies Needed ...................7
H. Inspect Appliance, Components
and Pre-Check List .............................7
Section 3: Dimensions & Clearances
A. Appliance
Dimensions
........................8
B. Clearances to Combustibles
As A Built-In Rear & Vertical ...............9-10
C. Clearances to Combustibles,
Masonry & Zero Clearance Fireplace ..10
D.
Floor
Protection
..................................10
E. Minimum Opening for Masonry
& Zero Clearance Fireplace ...............10
F.
Mantel
Projections
..............................10
G. Removing Metal Floor of Factory
Built
Fireplace
.....................................11
Section 4: Vent Information
A. Venting Termination Minimum
Requirements
.....................................12
B. Chimney & Exhaust Connections .......13
C. Equivalent Feet of Pipe.......................13
D. Pipe Selection Chart ...........................14
Section 5: Venting Systems
A. Direct Connect without Outside Air .....15
B. Direct Connect witht Outside Air .........15
C. Full Reline with Outside Air .................16
Section 6: Mobile Home Installation
............17
Section 7: Appliance Set-Up
A.
Leveling
System
.................................18
B. Outside Air Kit .....................................18
C. Hearth Support for ZC Fireplace .........19
D. Removal of Cast Sides .......................19
Section 7: Appliance Set-Up (Cont’d)
E. Panel & Cast Trim Set ........................20
F. Panel & Trim Set, Basic ......................20
G. Log Set Placement ..............................21
H. Wall Control Thermostat ......................22
Section 8: Operating Instructions
A. Fuel Size, Material & Storage .............23
B. General Operation Information ...........23
C. Before Your First Fire .........................24
D. Starting Your First Fire ........................24
E. Fire Characteristics & Flame
Height
Adjustment
..............................25
F. Battery Back-Up System ....................25
G.
Ignition
Cycles
....................................25-26
H. Quick Start Quide ...............................27-28
I.
Frequently Asked Questions...............29
Section 9: Troubleshooting
............................30
Section 10
:
Maintaining & Servicing Appliance
A. Proper Shutdown Procedure ...............31
B.
Quick Reference Maintenance Chart
.....
31
C. General Maintenance & Cleaning .......32-35
D. High Ash Fuel Content Maintenance ..36
E. Baffle
Removal
....................................36
F. Glass
Replacement
.............................37
Section 11: Reference Material
A. Component
Functions.........................38-39
B.
Component
Locations
.........................40
C. Exploded
Views
..................................41-42
D. Service Parts & Accessories...............43-46
E. Service & Maintenance Log ................47-48
F.
Homeowner’s
Log
...............................49
G.
Warranty
Policy
...................................50-51
H.
Contact
Information
............................52
TABLE OF CONTENTS