background image

   

   

Wyvern   200   Assembly   Guide

   

   

Central   Stack   Assembly   

STEP   3,   INSTALL   BATTERY   PLATE   AND   STANDOFFS   

The   battery   strap   can   now   be   permanently   installed.   It   is   held   in   place   using   the   

Battery   Plate

   (C)   and   

the   M3   X   14mm   Bolts

   (J).   The   battery   plate   bolts   will   screw   

into   the   

40mm   Standoffs

   (C).   This   is   another   place   where   you   can   use   thread-­‐

locking   compound   if   desired.   

STEP   4,   INSTALL   PDB   AND   FLIGHT   CONTROLLER   

If   you   did   not   install   your   electronics   in   Step   
1   above   then   you   can   install   them   here.   The   

PDB

   (B)   is   held   down   by   the   

Nylon   

Standoffs   

(D)   and   the   flight   controller   

board   is   held   down   by   the   final   set   of   

Nylon   

Nuts   

(D).   

Summary of Contents for Wyvern 200

Page 1: ...WYVERN 200 ASSEMBLY GUIDE...

Page 2: ...Table of Contents TABLE OF CONTENTS Introduction 3 Required Components 3 Parts Identification 4 Carbon Parts 4 Additional Parts 5 Main Frame Assembly 6 Central Stack Assembly 8 3D Printed Parts and To...

Page 3: ...Wyvern 200 there are a few specific components that were used in the design of the frame in order to optimize its characteristics The following is a list of the components you will need to use if you...

Page 4: ...e note tis plate has a front and a back as well as a top and a bottom in the picture it is depicted top up B Bottom Plate please note that the opening in this plate has a wide and a narrow side these...

Page 5: ...tion Board PDB with 5V and 12V regulators C 40mm Standoffs X4 D Nylon Bolts X4 Standoffs X4 and Nuts X8 E Antenna Tubes X2 F M2 X 8mm Camera Bolts X8 G Camera Mounts Left and Right H M3 X 8mm Bolts X4...

Page 6: ...E ARMS Place the 4mm Arms E over the M3 X 14mm bolts J this will ensure that they are in the proper location The arms should come together at the inside edges and the semi circular notches will line u...

Page 7: ...arms properly insert and screw in the main sandwich bolts loosely until all 4 are in place If you use thread locker on your frames now is the time to apply it to these bolts Once all four bolts are i...

Page 8: ...with the orientation of the Bottom Plate B The picture to the left shows the orientation of these two components the narrow segment of the Battery Plate C must align with the wider section of the Bott...

Page 9: ...14mm Bolts J The battery plate bolts will screw into the 40mm Standoffs C This is another place where you can use thread locking compound if desired STEP 4 INSTALL PDB AND FLIGHT CONTROLLER If you did...

Page 10: ...the SMA connector on the VTX and the antenna or a nut Since not all SMA connectors are the same length please ensure that the antenna is completely seated and that you have a connection If the VTX is...

Page 11: ...Top Plate D using the M3 X 8mm Bolts H The cutout in the top plate faces the front of the frame If desired the top plate is equipped with a center hole to allow a bracket mounted camera such as the H...

Page 12: ...older to LED wire lead to the LED Board A before installation and then to the PDB B after installation Finally feed your receiver antennas through the holes and insert the provided antenna tubes into...

Page 13: ...dmonsters thehobbymonster com Disclaimer Quad Monsters does not accept any responsibility or liability for misuse of this or any other product All our products are extensively tested to comply with ri...

Reviews: