C)   U

NLOADING   

P

ALLET   

M

AGAZINE

:

   

1)         To   remove   pallet   stack,   the   yellow   vertical   Pallet   Containment   Mechanism   (PCM)   located   on   

each    side    of    the    upper    pallet    magazine    opening    must    first    be    retracted    into    the    side    wall   
pockets   and   locked   out   of   the   way.   

2)         Manually   push   the   yellow   PCM   on   one   side   into   its   retracted   position   inside   the   sidewall.   While   

holding   the   PCM   in   this   retracted   position   with   one   hand,   pull   the   black   PCM   LOCK   OUT   lanyard   

outward   with   the   other   hand.   Lock   the   PCM   lanyard   onto   the   small   black   post   that   will   hold   the   

PCM   in   its   retracted   position.       Be   sure   to   verify   that   the   PCM’s   leading   edge   is   inset    from   the   

surface      of      the      magazine.      This      enables      the      pallet      stack    to      be      removed      from    the      magazine   

without   catching   on   the   PCM.      Repeat   process   on   other   side   of   the   machine.      

WARNING:      

This   

process    will    disable    the    pallet    magazine    safety    feature    and    may    result    in    a    less    stable    pallet   

stack.      Caution   should   be   exercised   when   attempting   to   unload   the   machine.

   

3)         Once   the   pallet   magazine   is   cleared,   operator   must   enable   the   PCM   again   by   pressing   inward   on   

the   PCM   while   releasing   the   Lock   Out   lanyard   from   the   small   black   post.   Test   the   spring   loaded   

PCM   to   verify   that   it   is   functioning   properly   again.   

   

D)   R

EMOVAL   OF   A   

P

ALLET   

J

AM

:

   

1)         In   the   event   that   a   defective   pallet   causes   the   Dstacker   to   malfunction,   the   operator   will   need   

to   remove   the   pallet   stack   to   retrieve   the   problem   pallet.   

2)         Using   a   forklift,   remove   the   entire   pallet   stack   

   EXCEPT   

for   the   bottom   two   pallets,   which   should   

be   left   in   the   machine.      Be   sure   to   raise   the   pallet   stack   straight   up   above   the   black   base   before   

backing   away.   

3)         If   the   latches   are   still   caught   in   the   bottom-­‐most   pallet,   lift   the   second   pallet   up   and   out   of   the   

machine,    ensuring    to    clear    the    top    of    the    black    base    before    removing    it    from    the    machine   

magazine.       Next    lift    the    bottom    pallet    straight    up    slowly    making    sure    the    latches    flip    upward   

releasing   the   pallet.      Clean   area   and   repeat   the   loading   process   above.   

4)         If    at    this    point    it    appears    that    the    one    remaining    pallet    was    simply    jammed,    (e.g.    the    lifting   

latches   were   caught   on   one   of   the   pallets’   cross   members)   try   raising   the   pallet   slightly   until   the   
lifting   latches   fall   into   the   opening   between   the   top   and   bottom   pallet   boards.   Verify   that   the   

latch   mechanisms   are   at   the   same   height.   

5)         If   the   problem   persists,   contact   QTEK   Design   Service   at   519-­‐453-­‐1880.   

Summary of Contents for DStacker GS2

Page 1: ...n 441 Industrial Road London Ontario Canada N5V 1T6 sales qtekdesign com 877 453 1880 Fax 519 451 3124 www qtekdesign com Operations Service Manual DStacker GS2 DStacker GS2 Part Serial Production Cod...

Page 2: ...herwise the machine s functionality could be compromised 3 The site will require a minimum headroom clearance of 16 feet from the floor 4 The machine will require a minimum clearance around the unit a...

Page 3: ...shipping brace 5 Install upper pallet magazine onto middle pallet magazine using forklift put 5 pallets into upper pallet magazine then lift upper pallet magazine and align onto middle pallet magazin...

Page 4: ...hing the back wall before lowering them onto the pallets currently resting on the latches 5 Move the forklift back clear of the Dstacker and not allowing access to the pallets Hold down the priming sw...

Page 5: ...ne is cleared operator must enable the PCM again by pressing inward on the PCM while releasing the Lock Out lanyard from the small black post Test the spring loaded PCM to verify that it is functionin...

Page 6: ...chanisms Remove the pallet stack as per Section C from the DStacker chamber Manually push one of the four 4 latches inward The latches should offer some resistance and will return to the outward posit...

Page 7: ...ad London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 7 of 7 MACHINE ASSEMBLY photo 1 1 2 3 4 4 5 5 6 7 7 7...

Page 8: ...ndon Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 8 of 8 OPERATING INSTRUCTIONS photo 1A 1A 1A 2A 2A 3A 4A 5A...

Page 9: ...Industrial Road London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 9 of 9 1C 2C 3C 1D 2D 3D 3D 3D 3D 3D 3D 3...

Reviews: