background image

 

 

441   Industrial   Road,   London,   Ontario      L5V   1T6    Canada

   

[email protected]

   

www.qtekdesign.com

   

M000001   QTEK   DStacker   GS2   -­‐   INSTALLATION    OPERATIONS   MANUAL   May   2015

   

Page 3 of 3

 

 

 

MACHINE   ASSEMBLY

   

   

A

SSEMBLY   

S

EQUENCE

:

   

1)         The   DStacker   GS   will   arrive   on   one   skid   containing   two   main   sections   -­‐   the   machine   base   and   

the    middle    pallet    magazine    section    bolted    together    with    the    upper    magazine    section    being   

nested    inside    the    base.          The    pallet    will    also    contain    the    additional    installation    components   

which   include:   

a)          GS2   Front   Latch   Assembly

   

b)          All   machine   hardware   plus   ten   (10)   floor   anchors   
c)    Two   (2)   Front   mesh   guards

   

d)          Two   (2)   safety   bollards

   

e)          Spare   Parts   –   4   springs,   Battery   
f)    Operations   and   Service   Manual

   

2)         Move   the   complete   GS2   Dstacker   shipping   assembly   to   installation   area   accessing   the   heavier   

black   base   end   of   the   shipping   skid   with   a   forklift.   

3)         Remove      the      lag      bolts      used      to      secure      machine      and      components      to      wooden      shipping      skid.   

Remove   bollard   and   guarding   off   the   shipping   skid.   

4)        Remove    upper    pallet    magazine    from    shipping    skid:    using    the    forklift,    insert    forks    under    the   

wooden   shipping   brace   at   the   top   of   the   upper   pallet   magazine;   place   upper   pallet   magazine   on   

floor;   remove   wooden   shipping   brace.   

5)         Install   upper   pallet   magazine   onto   middle   pallet   magazine:   using   forklift   put   5   pallets   into   upper   

pallet   magazine   then   lift   upper   pallet   magazine   and   align   onto   middle   pallet   magazine.   Install   all   

connecting   fasteners.   

6)         Position    Dstacker:    using    the    forklift    lift    complete    assembly    with    5    pallets    3”    off    the    shipping   

skid.   Slide   the   shipping   skid   out   of   place,   move   the   GS2   Dstacker   onto   the   floor,   placing   it   in   the   

final   installation   location.      Level   the   2   sides   to   each   other   by   shimming   the   front   of   one   side.   

7)         Install   the   GS2   Front   Latch   Assembly.   Remove   the   front   corner   covers   and   install   the   GS2   Front   

Latch    Assembly    with    the    four    (4)    3/8-­‐16    cap    screws    and    lock    nuts.    Reinstall    the    front    corner   

covers   

8)         Secure   the   machine   to   the   floor   by   bolting   the   four   corners   of   the   base   using   the   3/4”   anchor   

bolts   supplied   by   QTEK.   

9)        Remove    counter    weight    shipping    support.    Remove    equipment    access    plate    and    access    the   

shipping    support.    Cut    tie    wraps    and    remove    all    shipping    material.    Reinstall    equipment    access   

plate   after   inspecting   area   for   any   shipping   debris.   

10)   Install   the   two   (2)   mesh   guards   and   braces   with   3/8-­‐16   cap   screws   
11)   Secure   the   two   (2)   Bollards   to   the   floor   by   bolting   the   base   using   the   5/8”   anchor   bolts   supplied   

by   QTEK.   

12)   Install   the   photo   eye   reflector   to   the   mesh   guards.   
13)   Plug   in   12   VDC   battery   
14)   Remove   all   shipping   material   and   clean   work   site.   

Summary of Contents for DStacker GS2

Page 1: ...n 441 Industrial Road London Ontario Canada N5V 1T6 sales qtekdesign com 877 453 1880 Fax 519 451 3124 www qtekdesign com Operations Service Manual DStacker GS2 DStacker GS2 Part Serial Production Cod...

Page 2: ...herwise the machine s functionality could be compromised 3 The site will require a minimum headroom clearance of 16 feet from the floor 4 The machine will require a minimum clearance around the unit a...

Page 3: ...shipping brace 5 Install upper pallet magazine onto middle pallet magazine using forklift put 5 pallets into upper pallet magazine then lift upper pallet magazine and align onto middle pallet magazin...

Page 4: ...hing the back wall before lowering them onto the pallets currently resting on the latches 5 Move the forklift back clear of the Dstacker and not allowing access to the pallets Hold down the priming sw...

Page 5: ...ne is cleared operator must enable the PCM again by pressing inward on the PCM while releasing the Lock Out lanyard from the small black post Test the spring loaded PCM to verify that it is functionin...

Page 6: ...chanisms Remove the pallet stack as per Section C from the DStacker chamber Manually push one of the four 4 latches inward The latches should offer some resistance and will return to the outward posit...

Page 7: ...ad London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 7 of 7 MACHINE ASSEMBLY photo 1 1 2 3 4 4 5 5 6 7 7 7...

Page 8: ...ndon Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 8 of 8 OPERATING INSTRUCTIONS photo 1A 1A 1A 2A 2A 3A 4A 5A...

Page 9: ...Industrial Road London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 9 of 9 1C 2C 3C 1D 2D 3D 3D 3D 3D 3D 3D 3...

Reviews: