Page 7 of 7

 

 

 

 

 

MACHINE   ASSEMBLY:   photo

   

1.   

1.   

    

2.   

 

3.      

   

4.   

4.   

5.      

5.   

   

6.   

  

7.   

   

7.   

 

7   

   

8.   

  

9.   

 

9      

 

10   

   

11.   

  

12.   

 

13.      

   

Summary of Contents for DStacker GS2

Page 1: ...n 441 Industrial Road London Ontario Canada N5V 1T6 sales qtekdesign com 877 453 1880 Fax 519 451 3124 www qtekdesign com Operations Service Manual DStacker GS2 DStacker GS2 Part Serial Production Cod...

Page 2: ...herwise the machine s functionality could be compromised 3 The site will require a minimum headroom clearance of 16 feet from the floor 4 The machine will require a minimum clearance around the unit a...

Page 3: ...shipping brace 5 Install upper pallet magazine onto middle pallet magazine using forklift put 5 pallets into upper pallet magazine then lift upper pallet magazine and align onto middle pallet magazin...

Page 4: ...hing the back wall before lowering them onto the pallets currently resting on the latches 5 Move the forklift back clear of the Dstacker and not allowing access to the pallets Hold down the priming sw...

Page 5: ...ne is cleared operator must enable the PCM again by pressing inward on the PCM while releasing the Lock Out lanyard from the small black post Test the spring loaded PCM to verify that it is functionin...

Page 6: ...chanisms Remove the pallet stack as per Section C from the DStacker chamber Manually push one of the four 4 latches inward The latches should offer some resistance and will return to the outward posit...

Page 7: ...ad London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 7 of 7 MACHINE ASSEMBLY photo 1 1 2 3 4 4 5 5 6 7 7 7...

Page 8: ...ndon Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 8 of 8 OPERATING INSTRUCTIONS photo 1A 1A 1A 2A 2A 3A 4A 5A...

Page 9: ...Industrial Road London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 9 of 9 1C 2C 3C 1D 2D 3D 3D 3D 3D 3D 3D 3...

Reviews: