![QPR 6690 Assembly Instructions Manual Download Page 4](http://html2.mh-extra.com/html/qpr/6690/6690_assembly-instructions-manual_3266797004.webp)
QPR 6690 10 Gallon Melter Applicator
ASSEMBLY INSTRUCTIONS
4 of 18
7322 Bonnyshire Drive
Chattanooga, TN 37416
September 2015
Step 1:
Assemble the propane tank tray to the body of the tank.
*Lay the tank body flat on the ground.
*Remove the three attachment bolts from the tank body.
*Align the three tray holes, with the three bolt holes.
*Screw in bolts and tighten firmly.
*Do not over-‐tighten the bolts. Check carefully for firm attachment.