QPR 6690 10 Gallon Melter Applicator
ASSEMBLY INSTRUCTIONS
17 of 18
7322 Bonnyshire Drive
Chattanooga, TN 37416
September 2015
Step 6B
Adjust valve tension screw to where there is no
This bolt should be
lateral movement of the valve, and the valve is
tight, but still allow
is well pressed into the receiver. However, it should
the rod to travel
not be so tight that the valve cannot open and close.
up and down on pull
Once positioned, lock in place with the lock nut.
of the control rod.
The tension on the valve will need to be adjusted
from time to time for proper operation due to
heat, vibration and wear.
These two bolts should
be 9ght and secure
Locking nut