P
OWER
G
EN
R
EPORTS
AND
C
HECKLISTS
3
1.3 COMMISSION SEQUENCE
Table 1-4 Commissioning Checklist
Step #
Step
Initials
1
Connect 12VDC Battery in PowerGen
• Connect ring terminal on black wire to the black terminal on the
battery
2
Disconnect customer electrical load
3
Engine Helium Fill
• Connect laptop to FPC via CAN bus cable, use TC1 temperature
reading for Helium Fill)
• Use the “Target Charging Pressure” table in section 12.5 of the
PowerGen Installation and Operation manual for reference or the
label on the engine beam of the system near the helium fill port
Engine Temperature indicated by FPC:
°C
Engine Helium pressure after filling:
PSI/BAR
4
Gas type connected to PowerGen: NG LGP Biogas
Gas static pressure (FPC/Data Tap/Gas Pressure):
mbar
5
Commissioning FPC firmware version (update to
latest):
6
Commissioning QEC firmware version (updated to
latest):
7
Gas Valve Tuning:
• 5650 Lambda High Reading (1.18):
• 5650 Lambda Low Reading (1.23):
• 600/1200/1800 Lambda High reading (1.2):
8
GHT VFD Speed Pot Setting as per PowerGen Installation and Operation
manual:
Customer GHT Tube Length:
ft
VFD Speed Setting: