5–Validation Methods for DCB and FCoE
Validation Step 7—Virtualization Verification
51031-00 A
5-29
Validation Step 7—Virtualization Verification
This validation step compares the performance of virtual machines on a single
host with performance on multiple hosts. The test runs one iSCSI initiator in one
virtual machine, and one FCoE initiator in another virtual machine as shown in
Figure 5-30
.
Figure 5-30. Setup for Verifying Virtualization
Validation Process
1.
Set up two virtual machines on one server, and install MLTT on each virtual
machine.
2.
Set up ETS.
3.
Configure the Analyzer to capture any frame.
4.
Use MLTT to set up remote control from one virtual machine, so that you can
control both virtual machines from one MLTT interface.
5.
Use MLTT to map iSCSI storage and Fibre Channel storage devices for
individual virtual machines.
4Gbps
10Gbps
Summary of Contents for Storage Networking (Unified Fabric Pilot)
Page 10: ...Preface Documentation Conventions x 51031 00 A...
Page 12: ...1 Overview 1 2 51031 00 A...
Page 18: ...3 Architecture Reference Architecture Description 3 4 51031 00 A...
Page 66: ...A Hardware and Software QLogic 5800V Series Fibre Channel Switch A 4 51031 00 A...
Page 72: ...C References C 2 51031 00 A...
Page 75: ......