4 – Installation
Installing a Switch
59096-04 A
4-7
A
If you are using the 10-Gbps ports, remove the port covers by the cover tabs using
your fingers or pliers as shown in
Figure 4-4
.
Figure 4-4. Removing 10-Gbps Port Covers
To install XPAK switch stacking cables, position the cable connectors with the
circuit board toward the mid line of the respective switch faceplates as shown in
Figure 4-5
. When installing the 3-inch XPAK switch stacking cable, insert the
cable connectors into the 10-Gbps ports at the same time.
Figure 4-5. Installing XPAK Switch Stacking Cables
A
L
A
L
A
L
A
16
L
A
17
L
A
18
L
A
19
L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
A
16
L
A
17
L
A
18
L
A
19
L
A
L
A
L
A
L
A
L
A
L
A
L
A
16
L
A
17
L
A
18
L
A
19
L
A
Circuit Board
Summary of Contents for SANbox 5000 Series
Page 8: ...Page viii 59096 04 A SANbox 5000 Series Fibre Channel Switch Installation Guide S Notes...
Page 40: ...2 General Description Switch Management 2 14 59096 04 A S Notes...
Page 70: ...3 Planning Fabric Management 3 30 59096 04 A S Notes...
Page 92: ...4 Installation Installing Feature License Keys 4 22 59096 04 A S Notes...
Page 112: ...6 Removal Replacement Power Supply Removal and Replacement 6 4 59096 04 A S Notes...
Page 124: ...SANbox 5000 Series Fibre Channel Switch Installation Guide Glossary 6 59096 04 A S Notes...
Page 130: ...SANbox 5000 Series Fibre Channel Switch Installation Guide Index 6 59096 04 A S Notes...