3 – Planning
Fabric Security
3-22
59096-04 A
S
b.
Create an ISL group (Group_ISL_1) in Security_Set_1 with Switch_1,
Switch_2, HBA1, and JBOD as members. The Switch_1 secret must
be shared with the Switch_2 security database.
2.
Configure security on HBA_1 using the appropriate management tool.
Logins between the Switch_1 and HBA_1 will be challenged for their
respective secrets. Therefore, the secrets for Switch_1 and HBA_1 that you
configured on Switch_1 must also be configured on HBA_1.
3.
Save and activate Security_Set_1 on Switch_1.
4.
Create a security set (Security_Set_2) on Switch_2. Create an ISL group
(Group_ISL_2) in Security_Set_2 with Switch_2 and Switch_1 as members.
5.
Save and activate Security_Set_2 on Switch_2.
ISL Group on Switch_1: Group_ISL_1
Switch_1
Node WWN: 10:00:00:c0:dd:07:e3:4c
Authentication: CHAP
Primary Hash: MD5
Primary Secret: 0123456789abcdef
Binding: None
Switch_2
Node WWN: 10:00:00:c0:dd:07:e3:4e
Authentication: CHAP
Primary Hash: MD5
Primary Secret: abcdefabcdef012
Binding: None
ISL Group on Switch_2: Group_ISL_2
Switch_2
Node WWN: 10:00:00:c0:dd:07:e3:4e
Authentication: CHAP
Primary Hash: MD5
Primary Secret: 0123456789abcdef
Binding: None
Switch_1
Node WWN: 10:00:00:c0:dd:07:e3:4c
Authentication: CHAP
Primary Hash: MD5
Secret: abcdefabcdef012
Binding: None
Summary of Contents for SANbox 5000 Series
Page 8: ...Page viii 59096 04 A SANbox 5000 Series Fibre Channel Switch Installation Guide S Notes...
Page 40: ...2 General Description Switch Management 2 14 59096 04 A S Notes...
Page 70: ...3 Planning Fabric Management 3 30 59096 04 A S Notes...
Page 92: ...4 Installation Installing Feature License Keys 4 22 59096 04 A S Notes...
Page 112: ...6 Removal Replacement Power Supply Removal and Replacement 6 4 59096 04 A S Notes...
Page 124: ...SANbox 5000 Series Fibre Channel Switch Installation Guide Glossary 6 59096 04 A S Notes...
Page 130: ...SANbox 5000 Series Fibre Channel Switch Installation Guide Index 6 59096 04 A S Notes...