
3–Installation
HyperStacking
59229-05 A
3-31
7.
Secure the HyperStack cables in place using ties wraps as shown in
Figure 3-8
. Secure the outer cables to the rack posts; secure the inner
cables to each other. This reduces cable clearance to 7–8 inches and
provides room for the removal of the Power Supply and Fan blades on the
lower switch.
Figure 3-8 Securing HyperStack Cables
8.
Confirm that the ICC port Logged-In LEDs are illuminated. This indicates
that the switches are communicating.
9.
Enter the Show Interconnect CLI command to confirm each ICC port is
online.
QLogic #> show interconnect
Blade ID ICC ID State LSDB ID ISOREASON
-------- ------ ----- ------- ---------
CPU0 ICC0 Online 0x1000 NotApplicable
ICC1 Online 0x1001 NotApplicable
CPU1 ICC0 Online 0x1010 NotApplicable
ICC1 Online 0x1011 NotApplicable
Tie Wraps
Summary of Contents for QLogic 9000 Series
Page 1: ...59229 05 A QLogic 9000 Series Stackable Chassis Switch Installation Guide Firmware Version 7 8...
Page 18: ...Preface Technical Support xviii 59229 05 A Notes...
Page 93: ...3 Installation HyperStacking 59229 05 A 3 33...
Page 94: ...3 Installation HyperStacking 3 34 59229 05 A Notes...
Page 136: ...5 Customer Replaceable Units Replacing Fan Blades 5 24 59229 05 A Notes...
Page 152: ...A Specifications Regulatory Certifications A 16 59229 05 A Notes...
Page 158: ...QLogic 9000 Series Stackable Chassis Switch Installation Guide Glossary 6 59229 05 A Notes...
Page 166: ...QLogic 9000 Series Stackable Chassis Switch Installation Guide Index 8 59229 05 A Notes...
Page 167: ......