Maintenance vertical conveyor
80
UM-PRORUNNER_Mk5-1.2-EN-US
Install the sprocket wheel
1.
Install the sprocket wheel with clamping
bush onto the shaft.
2.
Align the sprocket wheel. Use a ruler (A)
to align the sprocket wheel with the side
guides (B) of the chain.
3.
Fix the clamping bush in the indicated
sequence.
4.
Fix the clamping bush.
Use the following torques:
•
shaft diameter
≤
40 mm: 17 Nm
•
shaft diameter
≤
65 mm: 41 Nm
•
shaft diameter
≤
95 mm: 83 Nm
5.
Install the chain. Refer to section
6.
Install the guard. Refer to section
.
Tip
Illustrations for installing: see the illustrations above for uninstalling.
WARNING
A poorly aligned sprocket wheel
will damage the chain.
B
A
1
6
5
4
3
2
7
8
I
Summary of Contents for PRORUNNER Mk5
Page 1: ...User Manual PRORUNNER Mk5 Version1 2 26 06 2014...
Page 12: ...About this manual 12 UM PRORUNNER_Mk5 1 2 EN US...
Page 22: ...Safety 22 UM PRORUNNER_Mk5 1 2 EN US 3 5 Safety symbols on the machine Terminal 12 Nm...
Page 38: ...Description 38 UM PRORUNNER_Mk5 1 2 EN US...
Page 58: ...Installation 58 UM PRORUNNER_Mk5 1 2 EN US...
Page 84: ...Maintenance vertical conveyor 84 UM PRORUNNER_Mk5 1 2 EN US...
Page 94: ...Maintenance belt conveyor 94 UM PRORUNNER_Mk5 1 2 EN US...
Page 98: ...Maintenance gravity roller conveyor 98 UM PRORUNNER_Mk5 1 2 EN US...
Page 108: ...Maintenance driven roller conveyor 108 UM PRORUNNER_Mk5 1 2 EN US...
Page 120: ...CE declaration of conformity 120 UM PRORUNNER_Mk5 1 2 EN US...
Page 174: ...Exploded views of product conveyors 174 UM PRORUNNER_Mk5 1 2 EN US...
Page 198: ...Electrical circuit diagrams 198 UM PRORUNNER_Mk5 1 2 EN US...
Page 200: ...Assembly instruction 200 UM PRORUNNER_Mk5 1 2 EN US...