background image

 

Page 1 

WHAT TO DO IF YOU SMELL GAS 
· 

Do not  try to light any appliance 

·  Do not touch any electric switch; do not use any phone in your 

building 

·  Immediately call your gas supplier from a neighbor’s phone.    

Follow the gas supplier’s instructions. 

· 

If you can not reach your gas supplier call the fire department 

 
Installation and service must be performed by a qualified installer, 

service agency or the gas supplier. 

Please Read Instructions Carefully  

Save for Future Reference 

Manufactured by: 

Biasi S.p.A. 

Verona, Italy 

 

Distributed By: 

QHT 

QUINCY HYDRONIC TECHNOLOGIES, INC. 

80 ROCHESTER AVE.  SUITE #12 

PORTSMOUTH, NH  03801 

PHONE: 603-334-6400 

FAX: 603-334-6401 

REV. H 

If the information in this manual is not followed exactly, a fire or 
explosion may result causing property damage, personal injury or loss of 
life. 

WARNING 

DANGER 

B10 SERIES BOILER 

B3-B9

 

 

Boiler Manual And Installation  

Instructions for Atmospheric Venting 

Summary of Contents for BIASI B-10

Page 1: ...a qualified installer service agency or the gas supplier Please Read Instructions Carefully Save for Future Reference Manufactured by Biasi S p A Verona Italy Distributed By QHT QUINCY HYDRONIC TECHNOLOGIES INC 80 ROCHESTER AVE SUITE 12 PORTSMOUTH NH 03801 PHONE 603 334 6400 FAX 603 334 6401 REV H If the information in this manual is not followed exactly a fire or explosion may result causing prop...

Page 2: ...y as those we specify The installing contractor is the best judge of a system s specific requirements as well as the local availability of certain makes and models of controls and accessories The preceding does not apply however to the equipment that comes with every boiler such as the overheat control L4006A or 7248U and pressure relief valve The installation of the specific devices supplied with...

Page 3: ... 16 Gas Venting 7 3 17 Burner Setup 8 18 Oil 8 1 19 Gas 8 2 20 Gas Line Piping 9 21 Boiler Jacket Assembly 10 22 Wiring 11 23 24 Oil Diagrams 11 1 25 28 Gas Diagrams 11 2 29 30 Commissioning the Boiler 12 31 Maintenance 13 31 Installer Notes 14 32 Warranty Inside Backcover This installation manual is for the basic installation of a B10 series boiler for atmospheric venting of oil and gas If you ar...

Page 4: ...hazards Please read the literature and warranties supplied by the manufacturers of the various accessory equipment This equipment is warranted by the respective manufacturers not by Quincy Hydronic Technologies Inc Each piece of equipment must be installed and used according to the recommendations of the manufacturer Codes and Regulations Installation of the boiler burner oil tank and related equi...

Page 5: ...ed with those of influenza and the highest incidence of poisoning occurs at the onset of cold weather or during flu season A victim may not experience any symptoms only one symptom or a few symptoms Suspect the presence of carbon monoxide if symptoms tend to disappear when you leave your home The following signs may indicate the presence of carbon monoxide IF ANY OF THE SYMPTOMS OCCUR OR IF ANY OF...

Page 6: ...h your gas supplier call the fire department 7 If you don t smell gas go to the next step 8 Return the manual valve on the combination gas valve to the on position by reversing step 5 9 Turn on all electric power to the appliance 10 Set thermostat to the desired setting 11 If the burner fails to light you may press the reset button once If the appliance will not operate follow the instructions To ...

Page 7: ...A or 7248U aquastat 1 Immersion well 1 X 3 Nipple 1 Combo pressure temp gauge 1 30 PSI Pressure relief valve 1 Boiler drain 1 Cera fiber Pad for floor of combustion chamber 2 Plugs 1 X Bushing 1 90 Elbow 1 Double acting barometric damper with manual reset spill switch Gas systems only 1 General Information All dimensions are in inches L 18 3 4 29 3 4 Boiler Model Heating Capacity Flue Gas Resistan...

Page 8: ... sections together evenly measure with yardstick Draw the sections together until sections make iron to iron contact at a point around the top and bottom ports of each section DO NOT OVER TIGHTEN DRAW RODS NOTE When cutting off excess length of draw rods allow enough length to install boiler jacket on the draw rods 2 Boiler Block Assembly Boiler Components Parts BIASI B Series Boiler Block Assembl...

Page 9: ...terials 1 9 from the top sides and rear of the boiler 2 18 from the flue pipe in any direction 3 24 from the front of the boiler DANGER The boiler must be located on a non combustible floor A smooth level concrete floor is recommended Locate the boiler as close as possible to the chimney If boiler is installed on combustible flooring consult local authorities for proper method of covering floor Th...

Page 10: ... NOTE See Page 19 for available gas burners in North America BIAS Heat Wise BAROMETRIC DAMPER WITH MANUAL RESET SPILL SWITCH ALTERNATIVE DAMPER LOCATION BIASI B10 POWER GAS BURNER GAS COCK DRIP LEG UNION GAS TRAIN Trim Kit Components 1 Honeywell L4006A or 7248U aquastat 1 Combo pressure temp gauge 1 X 3 Nipple 1 30 PSI pressure relief valve 1 Boiler drain 1 Cera fiber Pad for floor of combustion c...

Page 11: ... 7248U Screw the unit to side panel of the boiler as close to the immersion well as possible using the tabs on the aquastat Run the sensor from behind the aquastat to the immersion well and fix it according to Honeywell s instructions The 7248 can be adjusted between 140o F and 220o F with a fixed differential of 30 degrees 2 Install Pressure Relief Valve in opposite upper rear tapping using 3 nip...

Page 12: ... the boiler s purging expansion station Clearance for hot water pipes are 1 inch to combustibles The make up water line must be piped into the boiler and be fitted with a backflow preventer and a pressure reducing valve to reduce line pressure to 10 to 15 psi In the case of a gas installation the boiler should be installed such that the gas ignition system components are protected from water dripp...

Page 13: ... ventilation is to come from outside the building Two 2 openings shall be provided with one opening commencing within 12 inches of the top and an opening commencing within 12 inches of the bottom of the enclosure These openings shall not be located closer than 3 inches from either the top or bottom of the enclosure and shall connect directly or by ducts with the outdoors The area of each opening s...

Page 14: ... a rating of 1 perm or less with openings sealed with gaskets etc 2 Weather stripping has been added on open able windows and doors and caulking or sealants are applied to areas such as joints around windows and door frames between sole plates and floors between wall ceiling joints between wall panels at penetrations for plumbing electrical and gas lines and in other openings If the building is of...

Page 15: ...ge control such as a delay off timing control to prevent problems with fogging and nozzle post drip The exhaust pipe connection from the boiler to the chimney should be as short as possible with a minimum number of elbows The vent pipe must have a vertical rise of at least 1 4 inch per foot of horizontal run The vent pipe must be of the same diameter as the flue outlet on the boiler The chimney co...

Page 16: ...exhaust fans fireplace dampers and any other gas burning appliance to their previous condition of use 7 Any improper operation of the common venting system should be corrected so the installation conforms with the National fuel Gas Code ANSI Z223 1 and or CAN CGA B149 Installation Codes When resizing any portion of the common venting system the common venting system should be resized to approach t...

Page 17: ...l Gas Code ANSI Z223 1 or Section 7 Venting Systems and Air Supply for Appliances of the CAN CGA B149 Installation Codes or applicable provisions of the local building codes Vent connectors serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under positive pressure 7 3 Gas Venting ...

Page 18: ... check things such as the pump pressure CO2 levels etc Gas 1 Checking the electrode orifice size and flame rod settings against manufacturer s specs to insure proper operation 2 Installing properly sized gas piping according to BTU input required and length of gas line run 3 Making sure there is proper manifold pressure before and after the gas valve using a calibrated manometer 4 Checking draft a...

Page 19: ... Head Type L1 L1 V1 V1 V1 2 Setting Air Shutter 8 0 10 0 7 0 10 0 10 0 Air Band 0 0 0 0 0 0 1 0 3 0 The highlighted burners are not listed by ULC and may not be installed on Biasi equipment in Canada This page is only for boilers using an oil burner If a gas burner is being used please refer to page 19 for the proper setup of the burner and gas lines BURNER MANUFACTURER Heat Wise Pioneer Boiler Mo...

Page 20: ...res W C Head Setting Air Gate Man Pres W C Head Setting Air Gate B 4 R200 110 1 06 2 2 1 1 32 2 1 B 5 R200 140 1 20 2 8 2 1 76 2 7 2 B 6 R200 175 1 46 2 8 3 2 34 2 9 3 B 7 R400 207 1 22 2 0 1 48 2 0 B 8 R400 248 1 26 2 3 1 1 64 2 3 1 Heat Wise Natural Gas Propane Boiler Model Burner Model Input MBH Man Pres W C Head Setting Air Gate Man Pres W C Head Setting Air Gate B 4 SU 2A 115 3 5 12 3 2 3 12 ...

Page 21: ...lve When installing the boiler make sure a pipe compound resistant to the action of liquefied petroleum is used Check piping for leaks Always check leaks with a water and soap solution DO NOT USE A FLAME FOR CHECKING GAS LEAKS The boiler and its individual shut off valve must be disconnected from the gas supply piping during any pressure testing of that piping at test pressures in excess of 1 2 ps...

Page 22: ...el 28 in place and secure with self tapping screws provided Fasten the washers and hex nuts to the ends of the tie rods to hold the jacket in place Set the top panel 27 in place and secure with two screws in the back of the panel With the jacket firmly secured place front panel 37 in position on the tabs on the side panels and press firmly to snap spring connectors in place NOTE Do not attach any ...

Page 23: ... the boiler when installed must be electrically bonded to ground in accordance with the requirements of the authority having jurisdiction or in the absence of such requirements with the National Electrical Code ANSI NFPA 70 and or the Canadian Electrical Code Part 1 CSA C22 1 Electrical Code Since the boiler is equipped with a swinging burner door the supplied 48 long burner wiring harness with 4 ...

Page 24: ...wire 1 to the 4006A 2 Run wire 2 to the L2 terminal on the 7248U instead of connecting to wire 4 3 Run wire 4 to the B2 terminal on the 7248U instead of connecting to wire 2 4 Run wire 5 to the B1 terminal on the 7248U instead of connecting to the isolated end switch 5 Lastly run low voltage wiring from the TT terminals on the 7248U to the isolated end switch 7248U WIRING PROCEDURE 4006A WIRING 72...

Page 25: ...must be done in accordance with applicable state local and national codes Use only copper conductors LINE HONEYWELL 7248U BLACK WHITE BROWN YELLOW RED RIELLO OIL BURNER CS HEATMANAGER 7248U CONTROL WIRING 11 Oil Burner Wiring ...

Page 26: ...Page 26 NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors RIELLO OIL BURNER SR504 CONTROL WIRING WITH DHW PRIORITY ...

Page 27: ...Page 27 NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors RIELLO OIL BURNER AZ 4P CONTROL WIRING WITH DHW PRIORITY ...

Page 28: ...NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors Page 28 CARLIN OIL BURNER SR501 CONTROL WIRING WITH DHW PRIORITY ...

Page 29: ...Page 29 NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors BECKETT NO AFII OIL BURNER ARM 4P CONTROL WIRING WITH DHW PRIORITY ...

Page 30: ...Note 2 All wiring must be done in accordance with applicable state local and national codes Use only copper conductors Page 30 11 2 Gas Diagrams HEATWISE SU 2A SR503 CONTROL WIRING WITH DHW PRIORITY ...

Page 31: ...NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors Page 31 RIELLO GAS BURNER AR861 2II CONTROL WIRING WITH DHW PRIORITY ...

Page 32: ...f a Low Water Cut Off is installed follow the manufactures suggested maintenance and test procedures 4 Adjust room thermostat so there is a call for heat and test boiler high limit for proper operation 5 Turn boiler safety switch off 6 Open lower swing door and remove upper clean out plate 7 Brush upper passages first and then clean combustion chamber of any debris with brush and vacuum 8 Remove s...

Page 33: ...___________ ______________________ _________________________ ______________________ Burner Manufacturer Type of Oil Burner Burner Model No Burner Serial No Nozzle Manufacturer Nozzle Spray Angle G P H Type Burner Performance Tests GROSS STACK TEMPERATURE ROOM TEMPERATURE AMBIENT NET STACK TEMPERATURE CO2 O2 SMOKE READING COMBUSTION EFFICIENCY COMMENTS 14 Installer Notes ...

Page 34: ...Page 34 ...

Page 35: ...Page 35 ...

Page 36: ...be responsible for 1 Components that are part of the heating system but were not manufactured by Biasi or QHT as part of the boiler 2 The workmanship of the installers of VEGA B 10 boilers Furthermore this warranty does not assume any liability for unsatisfactory performance caused by improper installation 3 Any costs for labor to remove or replace the faulty component 4 Improper burner applicatio...

Reviews: