UPPER HANDLES
3.
To attach the upper handlebar, first remove the two handlebar knobs and bolts if fitted.
4.
Position the upper handle over the lower handles, aligning the holes in the upper handle
with those in the lower handles. Insert the left fixing bolt from the inside of the handle
assembly and secure with the fixing knob on the outside. Insert the right fixing bolt and
then place the recoil holder over the bolt and secure with the fixing knob.
CABLE TIDY
1.
Place the cable tidy over the right handle assembly and house the cable into the tidy.
Summary of Contents for QG40-145SP
Page 25: ...PARTS DIAGRAM QG40 145SP 1938277001...
Page 28: ...PARTS DIAGRAM ENGINE 145cc...
Page 35: ......