UG-1084
ePAQ-9405
User’s Guide
Copyright © 2017 QEI
Test Panel
33
Example
CN 5 ENTER
Result: The function 2 (ON) relay for point number 5 (K11) will
operate.*
15.11.2 Off Relay Operation (CF)
To operate the function 1 (OFF) relay in a control point, (even numbered
relays K2-K16, typically) type
CF
(space) and the point number of the
relay.
7. Press the
ENTER
key. The relay will operate.*
8. All function 1 (OFF) relays may be controlled one at a time by
repeating steps 1. and 2., and using the different point numbers.
Example
CF 7 ENTER
Result: The function 1 (OFF) relay for point number 7 (K16) will
operate.*
*=The procedure for setting the relay control duration (the time that
the relay will be energized) depends upon the server application used.
Consult the system documentation for further information.
15.12 Communication Checks
Several test panel commands are associated with ePAQ communications testing.
The test panel can be used to identify port configuration, and to monitor
communications between the ePAQ and Master Station.
15.12.1 CONFIG Command
This command is used to check some of the communications port configuration
information, including port type, baud rate, process number, RTS to CTS delay (time
delay to send data after RTS is asserted), RTS Hold (time delay to keep RTS
asserted after data is sent), loop enabled (for fiber ports) and actual port assignment.
Configuration of ports is made through the ConfigWiz 2.0 software.
Example
Type:
CONFIG
<enter>
The test panel displays (example):
Port
Baud User RtsCts RtsHold
LB
----------------------------------------------------------------------------------------
RS232
9600 0000
50
0
No
none 0
RS485
9600 8200
250
10
No
Dnp/QUICS 0
Fiber
9600 0000
5
1
No
none 0
RS485-B 9600 0000
50
10
No
Irig 0
Fiber-B
9600 0000
5
1
No
Irig 0
Summary of Contents for DIO-9110
Page 1: ...UG 1084 ePAQ 9405 User s Guide December 2018 ...
Page 4: ......