QED Environmental Systems
AP-3 Manual
Page 14
Chapter 3: Equipment
Unpacking
During the unpacking procedure, check for the following:
• All parts on the packing list have been included in the box
• All fitting openings are unobstructed
• The equipment has not been damaged in shipment
Equipment List
The equipment list will vary depending on site specifications, but the following list is a typical
configuration:.
1.
Top-Loading or Bottom-Loading AP-3 with support ring
2.
Single stage filter/regulator with:
•
5 micron filter with manual drain (auto drain option)
•
Pressure regulator with gauge
3.
Pump Cycle Counter (PCC)
4.
Hoses:
•
Fluid discharge hose (black)
•
System air supply hose (blue)
•
AutoPump air hose (green)
•
Air exhaust hose (blue)
Note:
Black nylon tubing can be used in place of hose.
Summary of Contents for AutoPump AP-3
Page 18: ...Page 9 AP 3 Manual Revision 3 April 2009 Figure 3 How it Works 601345 Chapter 2 Overview...
Page 25: ...QED Environmental Systems AP 3 Manual Page 16 Figure 5 Long and Short Bottom Loading AP 3 BL...
Page 37: ...QED Environmental Systems AP 3 Manual Page 28 Figure 12 Locking Quick Connects 600259 02...
Page 41: ...QED Environmental Systems AP 3 Manual Page 32 Figure 16 AP 3 Assembly Well Cap with Hose Barbs...
Page 47: ...QED Environmental Systems AP 3 Manual Page 38 Figure 19 Hose Bundling Part 2 of 2 600487 03...
Page 57: ...QED Environmental Systems AP 3 Manual Page 48 Figure 20 Removing AP 3 Pump Casing...
Page 119: ...QED Environmental Systems AP 3 Manual Page 110 Log Notes...