INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK ML-G10/t

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO BLK ML-G10/t

16

17

4 Electrical Connection

4.1 Safety

Danger! 
Risk of fatal injury due to electric shock!

When disconnecting an electric circuit carrying direct current, 
electric arcs can occur that may result in life-threatening injuries.

  Do NOT unplug the cable when under load.
  Do NOT connect any exposed cable ends.
  Electrical work may only be performed by qualified and skilled 

personnel (see page 3).

A solar module generates electrical current and voltage even 
at a low intensity of illumination. Sparks and electric arcs may 
result from the separation of a closed circuit. These can result 
in life-threatening injuries. The danger increases when several 
modules are connected in series.

  Please be aware of that the entire open circuit voltage is active 

even at low levels of solar irradiation.

  Please follow the valid national regulations and safety guide-

lines for the installation of electrical devices and systems.

  Please make sure to take all necessary safety precautions. 

With module or phase voltages of more than 120 V, the safety 
extra-low voltage range is exceeded.

  Carry out work on the inverter and the wiring with extreme cau-

tion.

  Ensure that the modules are disconnected at the inverter prior 

to separation.

  Be sure to observe the time intervals specified by the inverter 

manufacturer after switching off the inverter.

  Make sure that the plugs can not be connected unintentionally.
  Before working on the contacts, check them for safety ex-

tra-low voltage.

Danger! Risk of fatal injury due to electric shock!

  Only use dry, insulated tools for electrical work.

Danger! Risk of fatal injury due to electric shock!

  Never open the junction box.
  Do not remove bypass diodes.

Danger! Risk of fatal injury due to electric shock!

  Never touch live contacts with bare hands.
  Cover connectors by suitable protective caps until 

installation.

Danger! Risk of fatal injury due to electric shock!

  Insulate any exposed cable ends.
  Only connect cables with plugs.

4 Electrical Connection

4.2 Electrical installation safety

Danger! Risk of fatal injury due to electric shock!

  Be sure to maintain the time intervals as specified by 

the inverter manufacturer between switching off the 
inverter and beginning any further work.

Danger! Risk of fatal injury due to electric shock!

  Never plug or unplug the cable when under load. 

Modules must not carry any current.

1. Switch off the inverter.

OFF

EN

2. Switch off the DC circuit breaker.

3.  Measure shutdown in DC String. 

(no DC current flow).

4.  Disconnect plugs by the use of appropriate 

and qualified tools of the manufacturer.

5.  When connecting the modules proceed in reverse 

order.

Danger! Risk of fatal injury due to electric shock!

  Electrical work may only be performed by qualified 

and skilled personnel (see page 3).

  Ensure correct polarity.

Summary of Contents for Q.PEAK DUO BLK ML-G10/t Series

Page 1: ...Installation and operation manual Q PEAK DUO BLK ML G10 t solar module series ...

Page 2: ...ator are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such as country specific reg ulations for pressure equipment operational safety hazard ous goods and env...

Page 3: ...OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER IN STALLATION OR CONFIGURATION IMPROPER MAINTENANCE UNINTENDED USE AND UNAUTHORIZED MODIFICATION Attention This marking indicates that this product should not be disposed of with other household waste within the EU Recycle this product properly to prevent poss...

Page 4: ...Ensure that no additional forces are applied through the mount ing system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting po sitions caused by torsions displacements or vibrations in the mounting system are not allowed Ensure that the clamps and the mounting frame are compatible Clamp System Recommendations Use customary clamps that satisf...

Page 5: ...m long side 11 8 17 7 300 450mm CL6c outer clamps 0 79 19 7 20 500mm middle clamps 25 2 48 8 640 1240mm 3600 3000 2400 2000 outer clamps 0 79 13 8 20 350mm middle clamps 25 2 48 8 640 1240mm 4000 4000 2660 2660 CL6d short side 0 79 9 84 20 250mm long side 25 2 48 8 640 1240mm 4000 3600 2660 2400 The below mounting options are only possible under certain conditions MOUNTING OPTION POSITION OF CLAMP...

Page 6: ... load 2 Planning 2 3 Mounting options 2 Planning 2 4 Electrical layout Module Selection For detailed key electrical data please refer to the actual data sheet referring to the relevant Module available at www qcells com For maximum energy yields mismatches of specified electric current IMPP of more than 5 should be avoided for all mod ules connected in series Safety Factor During normal operation ...

Page 7: ...ock Do not install damaged modules Inform your distributor of any damages immediately Warning Fire Risk Do not install modules indoors Do not install modules on moving objects 3 Installation 3 1 Safety and Transport Note Module damage may occur Do not stack modules Note Module damage may occur Do not install modules near flammable gas vapors Do not install modules in close proximity to air condi t...

Page 8: ... of fatal injury due to electric shock Only use dry insulated tools Do not carry out the installation alone Only install undamaged modules and components Do not modify the module e g do not drill any additional holes 3 Installation 3 3 Module installation Option 1 Fasten the module with 4 clamps in the specified clamping range see Fig 2 p 7 Tighten clamps according to manufacturer s instruc tions ...

Page 9: ...paration Be sure to observe the time intervals specified by the inverter manufacturer after switching off the inverter Make sure that the plugs can not be connected unintentionally Before working on the contacts check them for safety ex tra low voltage Danger Risk of fatal injury due to electric shock Only use dry insulated tools for electrical work Danger Risk of fatal injury due to electric shoc...

Page 10: ...her audibly Danger Risk of fatal injury due to electric shock Ensure that all electrical components are in a proper dry and safe condition To avoid complex cabling arrangements it is often advantageous to rotate some modules 180 Module orientation can clearly be identified from the front side by the serial number and barcode labelled behind the module glass on the side with negative connection cab...

Page 11: ...should be attached to the frame grounding hole using a stainless steel screw toothed lock washer or KEPS nut in order to penetrate the anodized layer and backing nut Care should be taken to avoid the use of grounding hardware of dissimilar metals which may lead to corrosion Option B Integrated grounding methods The Qcells modules can be bonded with the racking system us ing UL1703 or UL2703 certif...

Page 12: ...age may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel ac cording to the state of the art and taking into account all rele vant safety issues and general product properties e g but not restricted to electrical safety mechanical stability load limits depending on the actual mounting options c...

Page 13: ...nstallation manual solar modules Q PEAK_DUO_BLK_ML G10 X t_modules_series_2023 02_Rev02_NA HANWHA Q CELLS AMERICA INC 400 Spectrum Center Drive Suite 1400 Irvine CA 92618 USA EMAIL WEB TEL hqc inquiry qcells com www qcells com 1 949 748 59 69 ...

Reviews: