Option 1:

 

Ä

Fasten the module with 4 clamps in the 
specified clamping range, 
see Fig. 3, p. 8.

 

Ä

Tighten clamps according to 
manufacturer’s instructions.

 

Ä

Maintain an interval of at least 10 mm between 
two modules along the short side and 5 mm 
along the long side.

10 mm

5 mm

EU

Note! Module damage may occur!

 

Ä

Do not subject modules to mechanical tension. 
Max. torsion 10 mm/m.

Option 2:

 

Ä

Install the module at the 4 mounting points, 
see Fig. 3, p. 8.

 

Ä

Tighten screws according to 
manufacturer’s instructions.

3  INSTALLATION

3.3 MODULE INSTALLATION

Option 3:

 

Ä

Install the module using mounting profiles,  
see Fig. 2, p. 7.

DANGER! 
Risk of fatal injury due to electric shock!

When disconnecting an electric circuit carrying direct current, 
electric arcs can occur that may result in life-threatening injuries.

 

Ä

Do NOT unplug the cable when under load.

 

Ä

Do NOT connect any exposed cable ends.

 

Ä

Electrical work may only be performed by qualified and 
skilled personnel (see page 3).

A solar module generates electrical current and voltage even 
at a low intensity of illumination. Sparks and electric arcs may 
result from the separation of a closed circuit. These can result 
in life-threatening injuries. The danger increases when several 
modules are connected in series.

 

Ä

Please be aware of that the entire open circuit voltage is 
active even at low levels of solar irradiation.

 

Ä

Please follow the valid national regulations and safety guidelines 
for the installation of electrical devices and systems.

 

Ä

Please make sure to take all necessary safety precautions. 
With module or phase voltages of more than 120 V, the safety 
extra-low voltage range is exceeded.

 

Ä

Carry out work on the inverter and the wiring with extreme 
caution.

 

Ä

Ensure that the modules are disconnected at the inverter 
prior to separation.

 

Ä

Be sure to observe the time intervals specified by the inverter 
manufacturer after switching off the inverter.

 

Ä

Make sure that the plugs can not be connected unintentionally.

 

Ä

Before working on the contacts, check them for safety extra-low 
voltage.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Never open the junction box.

 

Ä

Do not remove bypass diodes.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Never touch live contacts with bare hands.

 

Ä

Cover connectors by suitable protective caps 
until installation.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Insulate any exposed cable ends.

 

Ä

Only connect cables with plugs.

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Only use dry, insulated tools for electrical 
work.

4  ELECTRICAL CONNECTION

4.1  SAFETY

Summary of Contents for Q.PEAK DUO ML-G10.X Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO ML G10 X solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...nal safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional...

Page 3: ...ements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions...

Page 4: ...r stress free expansion and contraction due to temperature fluctuations Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Addi...

Page 5: ...10 Q PEAK DUO BLK ML G10 Q PEAK DUO ML G10 a Q PEAK DUO ML G10 a Q PEAK DUO BLK ML G10 a Q PEAK DUO BLK ML G10 a INSTALLATION ON MOUNTING POINTS Q PEAK DUO ML G10 Q PEAK DUO ML G10 Q PEAK DUO ML G10 2...

Page 6: ...stability of the mounting system including clamps has to be evaluated by the system supplier The listed test load values have been determined with the following clamp parameters clamp width 40 mm and...

Page 7: ...rrence of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reve...

Page 8: ...Note Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of...

Page 9: ...result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open c...

Page 10: ...led personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper w...

Page 11: ...light concentrators e g mirrors or lenses Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATI...

Page 12: ...w and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and taking into account all...

Page 13: ...17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar mo...

Reviews: